Laserfiche WebLink
JR' Page 8 <br /> Consulting, Inc. March 19, 2009 <br /> Environmental• Engineering• Geology Project Number 2009007 <br /> Mitigation methods <br /> No mitigation methods or measures are necessary for the septic system do to the results of <br /> the study. The winery wastewater will be land applied based on the regional water quality <br /> control board's requirements to mitigate any negative affect on the groundwater. No further <br /> mitigation measures are needed. <br /> / <br /> 5. CONCLUSIONS AND RECOMMENDATIONS <br /> The results of the Nitrate Loading Study indicate that the development of the site with a <br /> bouquet winery with the use of a standard septic system for the restroom will not cause <br /> significant additional impacts to the groundwater. The standard septic system should follow the <br /> San Joaquin County On-Site Wastewater Disposal Standards. <br /> Professional Signature <br /> It has been a pleasure to be of service. If any questions arise,please contact our office. <br /> Sincerely, <br /> JR Squared Consulting,Inc. j� F. �SS ��dNAL GEO <br /> R08/ ' �CyG' � ROBINSON <br /> JAMES D o0N <br /> ;A <br /> m Nc. 2441 <br /> • m o <br /> No. C 9 5 7D CERTIFIED <br /> ENGINEERING <br /> Exp. N>, GEOLOGIST <br /> Q- <br /> James binson �,^ pP�\ I �FOF CLF/ <br /> P.E 69045, C.E.G. 2441, P.G. 7834 <br /> /16. LIMITATIONS <br /> This report is applicable only for the project and site studied. Report findings and <br /> statements of professional opinion do not constitute a guarantee or warranty, expressed or <br /> JR SQUARED CONSULTING,INC. ENVIRONMENTAL•ENGINEERING•GEOLOGY <br /> 6532 MCNEIL COURT,VALLEY SPRINGS,CA 95252 PHONE(209)772-3841 •FAX(209)7404303 <br />