Laserfiche WebLink
Soil Suitability/ Nitrate Loading Study Irerracon <br /> Buddhist Temple Proposed Dormitory ■ Stockton, California <br /> July 11, 2019 ■ Terracon Project No. NA177056 <br /> Septic System No. 3 will be constructed for the proposed 12 bedroom dormitory. The dormitory <br /> is anticipated to increase nitrate as nitrogen levels by 11.8 mg/L-N for a total of 21.4 mg/L-N when-..— <br /> one person is calculated per bedroom which is also reflective of the proposed use. <br /> As a worst case scenario, the existing and proposed residential use have a potential to increase <br /> nitrate levels for the site as high as 33.3 mg/L-N if two occupants are calculated per bedroom.- <br /> The existing 5 bedroom residence will reportedly be used for storage and the kitchen and restroom <br /> will be used on as needed basis after the proposed 12 bedroom dormitory is constructed; <br /> therefore, nitrate levels for the existing and proposed land use are not anticipated to reach <br /> calculated levels. <br /> If the EHD requires mitigation for the project, an advanced water treatment product or carbon <br /> source may be considered mitigation options. <br /> 4.0 LIMITATIONS <br /> This report was compiled as a Soil Suitability Study and Nitrate Loading Study for the site. This <br /> report contains information and data provided to Terracon by several sources. Terracon in no <br /> way warrants the accuracy or completeness of the information provided to this study by those <br /> sources. This report is not equivalent to a Phase I Environmental Site Assessment and does not <br /> meet ASTM E1527-13 standards. Terracon specifically disclaims responsibility for any <br /> unauthorized use of this report. The findings and conclusions of this report are not scientific <br /> certainties, but rather, probabilities based on professional judgment concerning the significance <br /> of the data gathered during the course of this study. <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> Responsive ■ Resourceful ■ Reliable 21 <br />