My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012772
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
19111
>
2600 - Land Use Program
>
SU-91-3
>
SU0012772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 6:44:52 PM
Creation date
1/3/2020 10:06:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012772
PE
2611
FACILITY_NAME
SU-91-3
STREET_NUMBER
19111
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237-
APN
01906019
ENTERED_DATE
1/3/2020 12:00:00 AM
SITE_LOCATION
19111 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Inspection Division prior to any excavation or <br /> filling of earth material. <br /> C. The grading plan shall contain the information listed in <br /> the U.B.C. , Appendix, Chapter 70, Section 7006 (1) . <br /> d. The grading plan shall include complete drainage details <br /> and elevations of the adjacent parcels. Retaining wall <br /> details shall be submitted where applicable. <br /> e. Grading in excess of 5, 000 cubic yards shall comply with <br /> Section 7014 for "Engineered Grading Requirements. " <br /> f. All recommendations of the soils engineer shall be <br /> incorporated in the grading plans. <br /> g. All compaction reports must be submitted prior to a <br /> foundation inspection. <br /> h. All grading permits are subject to approval by the other <br /> departments. <br /> i. All grading authorized by the permit shall be approved <br /> prior to the issuance of any building permits or the <br /> beginning of any construction. <br /> 5 . AIR POLLUTION CONTROL DISTRICT: <br /> Conditions of Approval: <br /> a. The project shall implement the District' s fugitive dust <br /> control measures and ozone emission measures during <br /> construction. <br /> b. The applicant shall notify the District in writing with <br /> respect to the actual date of construction/grading one <br /> week prior to these activities . <br /> C. Adequate records of mitigation measures shall be <br /> maintained and provided to the Air Pollution Control <br /> District upon demand. <br />
The URL can be used to link to this page
Your browser does not support the video tag.