Laserfiche WebLink
of hydrated bentonite grout. The borehole should be grouted to <br /> the surface with hydrated bentonite. With respect to deep <br /> probe construction with multiple probe depths, the borehole <br /> should be grouted between probes. One(1) foot of dry <br /> granular bentonite should be emplaced between the filter pack <br /> and the grout at each probe location. See Figure 2 for more <br /> information. <br /> 3. The use of a downhole probe support may be required for deep <br /> probe construction (e.g., 40 feet bgs for direct push probes). <br /> a. Such probe support may be constructed from a one-inch <br /> diameter bentonite/cement grouted PVC pipe or other solid <br /> rod, or equivalent, allowing probes to be positioned at <br /> measured intervals. <br /> b. The support should be properly sealed or solid (internally or <br /> externally)to avoid possible cross-contamination or <br /> ambient air intrusion. <br /> c. The probes should be properly attached to the exterior of <br /> the support prior to placement downhole. <br /> d. Alternative probe support designs should be described in <br /> the project workplan. If probe support will not be used for <br /> deep probes,justification should be included in the project <br /> workplan. <br /> 4. Tubing should be properly marked at the surface to identify the <br /> probe location and depth. <br /> 5. As-built diagrams for probes or wells should be submitted with <br /> the soil gas investigation report detailing the well identification <br /> and corresponding probe depths. A typical probe construction <br /> diagram may be submitted for probes with common design <br /> and installation. <br /> 6. Unless soil gas probes are removed or decommissioned, <br /> probes should be properly secured, capped and completed to <br /> prevent infiltration of water or ambient air into the subsurface <br /> and to prevent accidental damage or vandalism.For surface <br /> completions, the following components may be installed: <br /> a. Gas-tight valve or fitting for capping the sampling tube; <br /> b. Utility vault or meter box with ventilation holes and lock; <br /> c. Surface seal; and <br /> d. Guard posts. <br /> 01/28/2003 -7- <br />