Laserfiche WebLink
GROUNDWATER SAMPLING FIELD NOTES <br /> Technician: h l/ ✓.r�"`� <br /> Site: /��( � Project No.: iZl10/ p C Date: 47 - /Y- /l <br /> Well No. Purge Method: J H <br /> Depth to Water(feet): Depth to Product(feet): <br /> Total Depth (feet) 2`f. 2t7 LPH &Water Recovered (gallons): <br /> Water Column (feet): 2 /Z q(B Casing Diameter(Inches): Z <br /> 80% Recharge Depth(feet): 6, Z3 1 Well Volume (gallons): t/ <br /> Depth to Volume Conductivity Temperature D.O. <br /> Time Time p H ORP Turbidity <br /> Start Stop Water Purged (NS/Cm) (F, P (mg/L) <br /> feet (gallons) <br /> Pre-Purge <br /> 2G '/ <br /> Static at Time Sampled Total Gallons Purged Sample Time <br /> 2. ( '2 <br /> Comments: 1 I <br /> Well No. AA( Purge Method: 7� <br /> Depth to Water(feet): Ig Depth to Product(feet): <br /> Total Depth (feet) 3. I LPH &Water Recovered(gallons): <br /> Water Column(feet):( Casing Diameter(Inches): 2 <br /> 80% Recharge Dep th(feet): 7i 1 Well Volume(gallons): <br /> a Time t)epth to Volume <br /> Time Time Start Stop Water Purged Conductivity/ Temperature pH (mglL) ORP Turbi ity <br /> feet allons <br /> Pre-Purge �• `� <br /> Static at Time Sampled Total Gallons Purged Sample Time <br /> Comments: <br /> IC'TFCC <br />