My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QUARTER 2010 STATUS SUMMARY REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
ARCHIVED REPORTS_THIRD QUARTER 2010 STATUS SUMMARY REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:33:49 PM
Creation date
1/6/2020 1:40:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QUARTER 2010 STATUS SUMMARY REPORT
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME: Former Tosco Bulk Terminal 10013 JOB NUMBER: 211402809 200.1250 <br /> SITE ADDRESS: 3505 Navy Drive START DATE: 4y4lP6 Ff3 Fij—q_t <br /> Stockton,CA DATE PREPARED: 4/12010 <br /> PREPARED FOR: RiepaW MSA,, i- t,, PREPARED BY: Wesley Snyder <br /> WORK REQUEST FORM <br /> SCOPE OF WORK: Oxygen Injection <br /> 1) Sign in at the Nustar Energy Facility(2941 Navy Drive Stockton) Check-in with Terminal Representetfve <br /> Work wan terminal representative in filling out the days work ill and on getting access to the site <br /> Required PPE includes Nomex coveralls hard hat and safety glasses at all times <br /> Arrive at site-Review(1) HASP (2)work order,then call Ed 384-0773 or Sean 916-281-8975 <br /> 2) Collect Pre-injection DO and Initial DTW Readings (See DTW& DO FORM) <br /> 3) Based on Instruction from Ed or Sean follow the days plan for which wells <br /> (IP-10 IP-11, IP-14 IP-15 IP-16 IP-17 MW-221 to inject into <br /> Inject into two wells simultaneously at a maximum Each well needs two 150 cf cylinders to be injected <br /> (Cannot currently inject into IP-12 and P-6 due to access issues) <br /> 4) During injections record time 02/LEL DTW induced pressure in designated observation wells <br /> (See Observation Field Data Sheet) <br /> 5) Collect Post injection DO readings <br /> 6 Call Ed or Sean before you leave the site. <br /> Fill Out CPEquipment Billing Sheet for all equipment used on the job. <br /> Turn in field notes ASAP <br /> Bill labor and Air Gas charge to 211402809 200.1250 <br /> Site Health 8 Safety Plan located onsite <br /> D.O. Meter; LEU02 meter <br /> 02 canisters, hosing, regulators <br /> 12", 9/16', and 15/16"sockets, and other misc.tools <br /> traffic control delineators <br /> GENE_ ,,,L INFORMATION <br /> Direct questions to Sean Coyle office: (916) 384-0740 cell (916)281-8975/Simonis office: (916)384-0773 <br /> PROJECT MANAGER Sean Coyle AUTHORIZATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.