My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008826
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:13:03 PM
Creation date
1/7/2020 8:49:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008826
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 INTRODUCTION <br />' BSK & Associates, Inc (BSK) has prepared this Data Report based on drilling, soil sampling, <br /> and quarterly groundwater sampling activities During site activities BSK was the prime drilling <br /> contractor (C-57 #490942) <br /> The jobsite is located at 1400 Waterloo Road in Stockton, California (refer to Figure 1, Site <br />' Map). <br />' 21 Permits - Prior to commencement of drilling, a permit application (see Attachment A) and <br /> an addendum to the Work Plan (dated February 12, 1993) were submitted to San Joaquin County <br /> Public Health Services Environmental Health Division (SJPHS) for approval. SJPHS was <br />' notified 48 hours before any drilling or sampling began During placement of grout backfill and <br /> groundwater sampling a SJPHS inspector (Mary Meays) was present to observe field activities <br />' 22 Underground Utilities - Underground Service Alert (USA) was notified 48 hours before <br /> any subsurface work began Drilling activities did not commence until clearance was approved <br /> 1 by the utility companies <br /> 23 Site Safety Plan - Work was performed under the guidelines presented in a BSK prepared <br /> Health and Safety Plan <br /> 3.0 DRILLING AND SOIL SAMPLING METHODOLOGY <br />' A BSK & Associates geologist under direct supervision of a Registered Civil Engineer was <br /> present during drilling, soil sampling and groundwater sampling Dunes included- <br /> Filing permits and notifying SJPHS and Underground Service Alert before field <br /> activities began <br /> • <br /> Coordination i n and timingof field activities <br />' Implementing the Health and Safety Plan <br /> • Monitoring the air during drilling for the presence of volatile organic vapors <br />' 2 <br /> ', &,Assoc ates <br />
The URL can be used to link to this page
Your browser does not support the video tag.