Laserfiche WebLink
1 <br /> 16 <br /> • Installation of two monitoring wells (MW-5 to 90 feet and MW-6 to 89 feet) by <br /> BSK in December 1993 <br />' • Excavation of approximately 330 cubic yards of petroleum-impacted soil from <br /> the fon-ner UST pit and vicinity by IT in May 1995 A vapor observation point <br /> was constructed at the base of the excavation The excavation was subsequently <br /> backfilled with clean imported fill material and capped <br />' • Drilling of two soil borings to 64 5 feet (SB-1 and SB-2) by IT in August 1995 <br /> • Quarterly groundwater monitoring by BSK and IT since October 1992 <br /> r <br /> r <br /> MZ105-07-96/VDBF/96-0007 if 1-2 <br />