Laserfiche WebLink
• Drilling of one soil boring (B-1 to 81 5 feet) and one monitoring well (MW-4 to <br /> 95 feet) by Remediation Services, Inc (RST), also known as BSK & Asso , in <br />' October 1992 <br /> • Drilling of four soil bonngs (B-101 to 75 feet, B-102 to 75 feet, B-103 to 75 5 <br /> feet, and B-104 to 75 feet) by RSI in February 1993 <br /> • Installation of two monitoring wells (MW-5 to 90 feet and MW-6 to 89 feet) by <br /> RSI in December 1993. <br /> • Excavation of approximately 330 cubic yards of petroleum-impacted soil from <br />' the former underground storage tank (UST) pit and vicinity by IT in May 1995 <br /> This excavation was subsequently backfilled with clean imported fill material <br /> • Installation of a vapor observation point at the base of the excavation by IT in <br /> May 1995 <br /> • Quarterly groundwater monitoring of MW-4 since October 1992 <br /> • Quarterly groundwater monitoring of MW-5 and MW-6 since December 1993 <br /> r <br /> i <br /> i <br /> MZJ09-20-951VDBF195-0027 NBR 1-2 <br />