Laserfiche WebLink
3.0 SAFETY MEETINGS <br /> Daily Tailgate Meetings - "Tailgate" safety meetings would be held daily prior to work <br /> start-up to present and review health and safety concerns associated with the project. <br /> I <br /> 4.0 EMERGENCY RESPONSE <br /> Initial Response - All emergencies shall be reported by dialing 911 on the mobile phone <br /> located in the BSK support truck The nearest Hospital is St. Joseph's Medical Center <br /> at 1800 North California Street in Stockton (See Hospital Map, Figure A-1) <br />' 5.0 POTENTIAL CHEMICAL HAZARDS <br /> Chemicals which have been detected at the site from previous investigations and present <br /> a potential hazard to personnel are listed in Table 1 The drilling activities are anticipated <br /> to be outside the area of contamination, defined from previous site soil characterization. <br /> The primary route of entry for the chemicals which have high vapor pressures would be <br /> inhalation The primary routes of entry for non-volatile chemicals (diesel) would be <br /> through ingestion and eye contact. <br /> TABLE 1 <br /> Compound Vapor Threshold Time Short- IDLH Other <br /> Name Pressure Limiting Weighted Term (ppm) Hazards <br /> (mm Hg) Value Average Exposure <br /> (ppm) (ppm) Limits <br /> (ppm) <br /> Benzene 75 Ca 01 1.0 Ca <br /> Toluene 20 100 100 200 2000 <br /> Ethylbenzene 10 100 100 125 2000 <br />' Xylene 9 100 100 200 1000 <br /> Diesel Low NA NA NA NA <br /> Portland Cement NA 10* 10* NA NA Caustic <br /> When <br /> Wet <br /> Ca - Carcinogen <br /> NA - Not Available <br /> * - mg/M3 <br /> A-2 <br /> Associates- <br />