Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
'TABLE OF CONTENTS <br /> WORK PLAN <br /> 10 Background _ _ _ _ 1 <br /> 20 Introduction , _ , _ . 1 <br /> 30 Drilling and Soil Sampling Methodology 2 <br /> 40 Groundwater Monitoring Well Installation and Development 2 <br /> 50 Clean-up _ _ 3 <br /> 60 Chemical Testing Program . . _ 3 <br /> LIST OF FIGURES <br /> Figure 1 Site Map <br /> Figure 2 Site Plan <br /> Figure 3 Monitoring Well Details <br /> Figure A-1 (Nearest) Hospital Map <br /> APPENDIX A - HEALTH AND SAFETY PLAN <br /> 10 Project Data . . A-1 <br /> 20 Organizational Structure A-1 <br /> 30 Safety Meetings . . A-1 <br /> 40 Emergency Response . . _ A-2 <br /> 50 Potential Chemical Hazards _ A-2 <br /> 60 Physical Hazards A-3 <br /> 70 Personal Protective Equipment (PPE) A-3 <br /> 80 Air Monitoring A-3 <br /> Material Safety Data Sheet (Diesel Fuel No 2) <br /> •ssociates <br />