Laserfiche WebLink
1 <br /> 12.0 Emergency Response Plan <br /> 12.1G eneral <br /> The FC will establish evacuation routes and assembly areas for each site All personnel <br />' entering the site will be informed of these routes and assembly areas In the case of site <br /> evacuation, the following procedures shall be observed <br /> - Stopw working, secure equipment, and return to the CRZ for decontamination <br /> • Walk to the designated muster point. <br /> • Remain at the muster point and notify the nearest IT office until further <br /> information is received <br /> Personnel should not stand in driveways, streets or in front of gates, as these locations may be <br /> traffic routes for emergency and support vehicles entering the site. <br /> Each site activity will be evaluated for the potential for fire, explosion, chemical release, or <br /> other catastrophic events Unusual events, activities, chemicals, and conditions will be <br /> reported to the FC <br /> 12.2 Emergency Procedures <br /> If an incident (personal or vehicle accident, property damage, or near-miss) occurs, the <br /> following procedures will be used <br /> • The FC will evaluate the incident, assess the need for assistance, and notify the <br /> client <br /> • The FC will call for outside assistance as needed <br /> The FC will act as liaison between outside agencies and on-site personnel <br /> • The FC will ensure the Project Manager and an HS Representative at the nearest <br /> TT office are notified immediately of the incident <br /> • The FC will take appropriate measures to stabilize the incident scene <br /> 1 MZl11-29-94/RHS/HASP/94-0037 JAF 12-1 <br /> i <br />