Laserfiche WebLink
'Mr.`Thomas Kosel - 3 - 21 July 2006 <br /> startup report is due to this office no more than four weeks after the system startup <br /> date. <br /> 4. The Work Plan conservatively estimates a 10-foot radius of influence (ROI) around <br /> each injection well. ConocoPhillips should provide a description of how the ROI will be <br /> interpreted during pilot test performance. <br /> 5. Based on data collected during the pilot test, remediation system expansion may be <br /> necessary and should be addressed in the final pilot test report conclusions and <br /> recommendations. <br /> Notification of the Regional Water Board is required at least one week before system startup <br /> to facilitate our inspection. If you have any questions regarding this letter, you may contact me <br /> at (916) 464-4719 or mclardy@waterboards.ca.gov. <br /> Mark W. Clardy, P.G. <br /> Engineering Geologist <br /> Private Sites Cleanup Unit <br /> cc: Ms. Yuanyuan Hui, Earth Tech, Inc., San Jose <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br /> Ms. Debbie Callie, Port of Stockton, Stockton <br /> Mr. Mark O'Brien, Port of Stockton/ERSC, Alamo <br /> Mr. Richard Stiffler, City of Stockton — Department of Municipal Utilities, Stockton <br /> Mr. Jeff Kasper, Deputy Port Director, Environmental Planning & Facilities, Stockton <br /> Mr. Jeff Whitworth, Shell OPUS, Carson <br /> MWC/MWic dodWustinStaff\Mark\Tosco Stockton\4-21-06 Tosco 02 inj WP.doc <br />