My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:58:37 PM
Creation date
1/7/2020 2:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Mr.`Thomas Kosel - 3 - 21 July 2006 <br /> startup report is due to this office no more than four weeks after the system startup <br /> date. <br /> 4. The Work Plan conservatively estimates a 10-foot radius of influence (ROI) around <br /> each injection well. ConocoPhillips should provide a description of how the ROI will be <br /> interpreted during pilot test performance. <br /> 5. Based on data collected during the pilot test, remediation system expansion may be <br /> necessary and should be addressed in the final pilot test report conclusions and <br /> recommendations. <br /> Notification of the Regional Water Board is required at least one week before system startup <br /> to facilitate our inspection. If you have any questions regarding this letter, you may contact me <br /> at (916) 464-4719 or mclardy@waterboards.ca.gov. <br /> Mark W. Clardy, P.G. <br /> Engineering Geologist <br /> Private Sites Cleanup Unit <br /> cc: Ms. Yuanyuan Hui, Earth Tech, Inc., San Jose <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br /> Ms. Debbie Callie, Port of Stockton, Stockton <br /> Mr. Mark O'Brien, Port of Stockton/ERSC, Alamo <br /> Mr. Richard Stiffler, City of Stockton — Department of Municipal Utilities, Stockton <br /> Mr. Jeff Kasper, Deputy Port Director, Environmental Planning & Facilities, Stockton <br /> Mr. Jeff Whitworth, Shell OPUS, Carson <br /> MWC/MWic dodWustinStaff\Mark\Tosco Stockton\4-21-06 Tosco 02 inj WP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.