My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:58:37 PM
Creation date
1/7/2020 2:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOBIL INSPECTION -2- 14 JULY 1.987 <br /> I was told that two underground tanks at this site were recently <br /> removed under the direction of Mardo Kaprealian. The excavation at <br /> the corner of the site near the road had formerly contained a 280 <br /> gallon vapor drop out tank. This was the location where the black <br /> oil-like substance was observed on an earlier visit. I was told <br /> that vapor from the load rack is pumped to the Shell Bulk <br /> Distribution Facility to the west via underground pipes where it is <br /> condensed. The condensed liquid is recovered in the vapor drop-out <br /> tank. The excavation was open the day I was there, and a new 500 <br /> gallon fiberglass tank had been emplaced. No soil contamination was <br /> visible, but the excavation was partially backfilled. Mr. <br /> Kaprealian said that soil r.enoved from under the tank was <br /> contaminated, and samples of soil and water had been taken for <br /> analysis. He is preparing a report that will include the analyses, <br /> and a workplan which will propose a method to determine the extent <br /> of contamination at this site. He said the workplan will include <br /> proposed locations for three monitoring wells on the site. <br /> SUMMARY <br /> The Mobil site appears well-maintained on the surface. Removal of <br /> the outlet pipe from the underground tank would prevent any future <br /> discharges of polluted water to the ground surface from this pipe. <br /> The source of the dark oily substance observed in the underground <br /> tank excavation needs to be addressed by Mobil. Since the contents <br /> of the vapor drop-out tank should be of a different nature (clear_ , <br /> as gasoline would be rather than dark with the odor of diesel fuel) , <br /> it appears as though widespread subsurface contamination may exist <br /> at this site. The former practice of releasing the underground tank <br /> contents to the ground surface reinforces the idea that soil and <br /> ground water contamination at this site may be widespread. <br /> Ground water contamination at this site may also be a threat to the <br /> quality of the water in the Deep Ship Channel which is about 500 <br /> feet north-northeast of the site and the San Joaquin River which is, <br /> 1500 feet southeast of the site. <br /> Mobil has hired a consultant to provide a workplan for a subsurface <br /> investigation at this site. A report on the removal of underground <br /> tanks at the site has been received by our office. <br /> RRert t. Nibi ck <br /> Engineering Geologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.