My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:58:37 PM
Creation date
1/7/2020 2:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John Yoakum [EH] <br /> From: John Yoakum [EH] <br /> Sent: Tuesday, October 15, 2013 4:12 PM <br /> To: jim.kundert@cardno.com <br /> Subject: FW: Request for variance of well destruction methods at NuStar Terminal, Rough & <br /> Ready Island <br /> Jim, <br /> Your variance has been granted by Adrienne. <br /> Johnny Yoakum <br /> Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> From: Adrienne Ellsaesser [EH] <br /> Sent: Tuesday, October 15, 2013 4:08 PM <br /> To: John Yoakum [EH] <br /> Subject: RE: Request for variance of well destruction methods at NuStar Terminal, Rough & Ready Island <br /> Thanks for your comments that makes my part much easier! <br /> Allow them to be pressure grouted with 25 psi for 5 minutes applied. They can be filled to surface but keep the <br /> box/wellhead monument in place to make them. <br /> Adrienne <br /> From: John Yoakum [EH] <br /> Sent: Tuesday, October 15, 2013 4:05 PM <br /> To: Adrienne Ellsaesser [EH] <br /> Subject: FW: Request for variance of well destruction methods at NuStar Terminal, Rough &Ready Island <br /> Adrienne, <br /> Here is the request for variance at the Bulk Fuel Terminal at Rough and Ready Island. <br /> I have seen the borings and know that what he says is true. <br /> Johnny <br /> From: Jim Kundert [mailto:jim.kundert@cardno.com] <br /> Sent: Tuesday, October 15, 2013 3:18 PM <br /> To: John Yoakum [EH] <br /> Subject: Request for variance of well destruction methods at NuStar Terminal, Rough & Ready Island <br /> Five wells remain at the NuStar Terminal property: I13-12, MW-4, MW-14, P-5, and P-6. <br /> MW-4 is too close to an active propane line to put tools or a rig on. The line is part of an active vapor recovery and <br /> control system at the facility, and decommissioning it and moving it and several other lines out of the way would involve <br /> shutting down the entire facility. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.