My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2900 - Site Mitigation Program
>
PR0518632
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:52:57 PM
Creation date
1/7/2020 2:27:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518632
PE
2960
FACILITY_ID
FA0014022
FACILITY_NAME
ST SERVICES
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2941 NAVY DR
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0165 8 <br /> SUPPORT TERMINALS OPERATING PARTNERSHIP,LP <br /> STOCKTON TERMINAL <br /> ENHANCED BIOREMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> 5. If groundwater samples from extraction wells EX-1 and/or EX-2 contain nitrogen, <br /> phosphorus, and/or potassium in concentrations exceeding 20 percent above baseline <br /> concentrations, the Discharger shall immediately notify Regional Board staff of the <br /> exceedance(s) and obtain a confirmation sample within 7 days of receiving the <br /> results. Within 48 hours of receiving the confirmation sample results, the Discharger <br /> shall notify Regional Board staff of the results followed by written notification within <br /> 7 days. <br /> 6. Within 30 days of confirming an exceedance as described in Provision D.5,the <br /> Discharger shall implement the contingency plan as described in Finding 11 and <br /> submit sample results. <br /> 7. The Discharger shall comply with all conditions of this Order, including timely <br /> submittal of technical and monitoring reports as directed by the Executive Officer. <br /> Violations may result in enforcement action, including Regional Board or court order <br /> requiring corrective action or imposing civil monetary liability, or in revision or <br /> rescission of this Order. <br /> 8. The Discharger shall maintain records of all monitoring information including all <br /> calibration and maintenance records, copies of all reports required by this Order, and <br /> records of all data used to complete the application for this Order. Records shall be <br /> maintained for a minimum of three years from the date of the sample, measurement, <br /> or report. This period may be extended during the course of any unresolved litigation <br /> regarding this discharge or when requested by the Executive Officer. <br /> 9. The Discharger shall at all times properly operate and maintain all facilities and <br /> systems of treatment and control that are installed or used by the Discharger to <br /> achieve compliance with this Order. Proper operation and maintenance also includes <br /> adequate laboratory controls and appropriate quality assurance procedures. This <br /> provision requires the operation of backup or auxiliary facilities or similar systems <br /> which are to be installed by the Discharger only when necessary to achieve <br /> compliance with the conditions of this Order. <br /> 10. The Discharger shall report any non-compliance, and/or accidental spill or release of <br /> liquid or material verbally to the Regional Board within 24 hours of the spill or <br /> release, and follow-up the verbal notification with written documentation of the spill <br /> or release within 14 calendar days of the incident. <br /> 11. A copy of this Order shall be kept at the discharge facility for reference by operating <br /> personnel. Key operating personnel shall be familiar with its contents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.