Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2003-XXXX -2- <br /> SHORE <br /> 2- <br /> SHORE TERMINAL SERVICES TERMINAL#29 <br /> ENHANCED BIOREMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> Table 2 <br /> Constituents Units <br /> Electrical conductivity µmhos/cm <br /> pH pH units <br /> Oxidation-reduction potential millivolts <br /> Dissolved oxygen mg/l <br /> Temperature °F/°C <br /> Groundwater elevation Feet, mean sea level <br /> Field testing instruments (such as those used to test oxidation-reduction potential and <br /> dissolved oxygen) may be used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; G <br /> 2. The instruments are field calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and n <br /> 4. Field calibration reports are provided with the appropriate monitoring report. <br /> REPORTING t <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the <br /> date, sample type (e.g., influent, effluent, groundwater, etc.), and reported analytical result for <br /> each sample are readily discernible. The data shall be summarized in such a manner to clearly <br /> illustrate compliance with waste discharge requirements and spatial or temporal trends, as <br /> applicable. The results of any monitoring done more frequently than required at the locations <br /> specified in the MRP shall also be reported to the Regional Board. In addition, the Discharger <br /> shall notify the Board within 24 hours of any unscheduled shutdown of the enhanced <br /> bioremediation system. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, • <br /> all reports shall be prepared by a registered professional or their subordinate and signed by the 1 <br /> registered professional. j <br /> The Discharger shall submit a status summary report 30 days after the collection of the third and <br /> sixth month sampling events, which shall include: <br /> (a) a narrative description of all preparatory, monitoring, sampling, and analytical testing <br /> activities for the groundwater monitoring. The narrative shall be sufficiently detailed to <br /> verify compliance with the waste discharge requirements, this MRP, and the Standard P <br /> Provisions and Reporting Requirements. The description shall include a discussion of the �•/ <br /> groundwater sampling event and results, including trends in the concentrations of <br /> pollutants and groundwater elevations in the wells, how and when samples were <br /> collected; <br />