My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1401
>
3500 - Local Oversight Program
>
PR0545145
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 10:34:31 AM
Creation date
1/9/2020 10:17:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545145
PE
3528
FACILITY_ID
FA0003820
FACILITY_NAME
VALLEY WHOLESALE DRUG
STREET_NUMBER
1401
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525031
CURRENT_STATUS
02
SITE_LOCATION
1401 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> a! <br /> Wm. J. Hunter & Asso ates 2220 Loma Vista Dr. h <br /> Registered!Geologists. Sacramento, CA 95825 <br /> Petroleum& Mineral Appraisers (916) 972-7941 <br /> FAX (916) 972-1683 <br /> RE: BIDDING AND MINIMUM REQUIREMENTS FOR DEVELOPMENT, <br /> PURGING AND SAMPLING OF MONITORING WELLS <br /> The tasks required for;each well are: <br /> DEVELOPMENT: <br /> 1.) Surge and pump well construction materials with a surge block and o'r stainless steel <br /> bailer. Remove sufficient amount of material to clear well screen of construction <br />{ material and remove all sediments from well casing to create a conduit for-representative <br /> sampling. <br /> Pump or bail a minimum of five volumes from well to complete development. <br /> 2.) Containment of all purge and development water in D.O.T. 17 drums. <br /> 3.) Sound the well for total depth. <br /> 4.) Cap off and replace monument top. <br /> PURGING AND SAMPLING: <br /> i <br /> i <br /> 1.) Clean off andopen wellhead monument, secure area with appropriate traffic control. ; <br /> 2.) Initiate a detailed field monitoring log. <br /> 3.) Screen well head annulus for the presence of volatile aromatics iwith the use of a i <br /> calibrated photoionization detector. <br /> 4.) Scan for the presence of free floating product with a product interface meter. <br /> 5.) Confirm .depth to water and overall depth of each well. (calculate standing water <br /> column) <br /> 6.) Complete a 3-5 well volume purge with a 2" Grundfos stainless steel submersible'or a <br /> environmental bladder purge pump. <br /> 7.)• Record the Ph, Conductivity, Color and Temperature of each volume to establish-and <br /> confirm well development: <br /> { <br /> 8.) Contain all purge & decontamination water in D.O.T. 17 steel drums. <br /> 9.) Bail and Sample each well with a teflon, stainless steel or disposable bailer. <br /> (A bailer blank will be collected prior to sampling each well) `. <br />
The URL can be used to link to this page
Your browser does not support the video tag.