My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011072
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1401
>
3500 - Local Oversight Program
>
PR0545145
>
ARCHIVED REPORTS_XR0011072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:25:16 AM
Creation date
1/9/2020 10:31:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011072
RECORD_ID
PR0545145
PE
3528
FACILITY_ID
FA0003820
FACILITY_NAME
VALLEY WHOLESALE DRUG
STREET_NUMBER
1401
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525031
CURRENT_STATUS
02
SITE_LOCATION
1401 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wm. J. Hunter & Associates <br /> Registered Geologists 2220 Loma Vista Dr <br /> Petroleum& Mineral Appraisers Sacramento, CA 95825 <br /> (91 6) 972-7941 <br /> RE. BIDDING AND MINIMUM REQUIREMENTS FOR DEVELOPMENT,FAX (91 6) 972-1683 <br /> PURGING AND SAMPLING OF MONITORING WELLS <br /> The tasks required for each well are <br /> DEVELOPMENT: <br /> 1 ) Surge and pump well construction materials with a surge block and or stainless steel <br /> bailer Remove sufficient amount of material to clear well screen of construction <br /> material and remove all sediments from well casing to create a conduit for representative <br /> sampling. <br /> Pump or bail a minimum of five volumes from well to complete development <br /> 2 ) Containment of all purge and development water in D O T 17 drums <br /> 3 ) Sound the well for total depth. <br /> 4 ) Cap off and replace monument top <br /> 6 <br /> PURGING AND SAMPLING- <br /> 1 ) Clean off and open wellhead monument, secure area with appropriate traffic control <br /> 2 ) Initiate a detailed field monitoring log <br /> 3 ) Screen well head annulus for the presence of volatile aromatics with the use of a <br /> calibrated photoionization detector <br /> 4 ) Scan for the presence of free floating product with a product interface meter <br /> 5 ) Confirm depth to water and overall depth of each well (calculate standing water <br /> column) <br /> 5 ) Complete a 3-5 well volume purge with a 2" Grundfos stainless steel submersible or a <br /> environmental bladder purge pump. <br /> 7 ) Record the Ph, Conductivity, Color and Temperature of each volume to establish and <br /> confirm well development. <br /> 8 ) Contain all purge & decontamination water in D O.T. 17 steel drums <br /> 9 ) Bail and Sample each well with a teflon, stainless steel or disposable bailer <br /> (A bailer blank will be collected prior to sampling each well) <br />
The URL can be used to link to this page
Your browser does not support the video tag.