Laserfiche WebLink
117Y- <br /> UNDERG UND STORAGE TANK UNAUTHO ZED RELEASE (LEAK)I CONTAMINATION SITE REPORT <br /> EMERGENCYNHAS STAVE OFFICE OF EMERGENCY SERV <br /> S FOR LOCAL AGENCY USE ONLY <br /> YES O <br /> ' REPORT BEEN FILED? ❑ YES NO 1 HERE FY THAT 1 HA IS UTED IS INF NATION ACCORDING TOTHE <br /> ❑ <br /> D UT TH7AW7zri REPORT DATE CASE�u� p� r{ r S!G!E <br /> ' w NAAI �O UVR�P�Tlli1 1GNATURi <br /> w REPRE TING ❑ owNERrOPERATOR C] REGIONAL BOARD COMP �RAGENGYNAMEVOCALAGENCY ElOTHER S — YD <br /> ' g ADDR S ffjap � <br /> ' yNAME I �} J Pro"UNKNOWN <br /> CONT PERSON I`16 ] 3I <br /> zcr <br /> O a AOORESS <br /> Nol <br /> /! rr-Q� <br /> 6�n�d <br /> C] (//��C��J�1y(JM' 4 //{�d W (57 fn,` TATE I p <br /> ' I FAGLffY N E APPLICABLE) 6OPERATOR PHONE <br /> 0 <br /> 109) W6 -01,31 <br /> a ADDRESS if 5 T <br /> y CRO TREET f , <br /> vL <br /> ' C7 LOCA E C / AGeEI( NAME CONTACT PERSON PHONE <br /> Lu <br /> wW --T <br /> REGIO AL BOARD C� /PHONE <br /> NAME QUANTITY LOST(GALLO <br /> w <br /> ' i w UNKNOWN <br /> FJ <br /> co 2 �) <br /> vi ❑ UNKNOWN <br /> .- DATE DISCOVEREDHOW DGCOVERED INVENTORY CONTROL ❑ SUBSURFACE MONITORING a NUISANCE CONDONS <br /> w Y/u c�Cl D� r r TANK TEST ITITANK REMOVAL ❑ OTHER <br /> r <br /> a DATE DISCHARGE BEGAN METHOD USED TO STOP DISCHA (CHECK ALL THAT APPLY) <br /> m <br /> ' UNKNOWN ❑REMOVE CONTENTS 02�CLosrTANKd REMOVE ❑REPAIR PIPING <br /> Lu IA <br /> Y t) Y <br /> } HA7Dt NGHARGE BEEN STOPPED 7 REPAIR TANK CLOSE TANK d FILL IN PLACE ❑CHAE PROCEDURE <br /> `^ YES El IF YES DATE M 61.1 " D� t� `r r REPLACE TANK ❑ OTHER <br /> n <br /> ' -A I SOURCE OF DISCHARGE CAUSE(S) <br /> w <br /> 2 TANK LEAK Ur.rQiGlrTi ❑ OLEAFILL � UPTU9EIFAILURE ❑ SPILL <br /> a <br /> U r7 PIPING,LEAK OTHER C:] CORROSION <br /> UNKNOWN ❑ OTHER <br /> ' w CHECK ONE ONLY <br /> O ❑ UNDETERMINED SOIL ONLY GROUNDWATER ❑ DRINKING WATER (CHECK ONLY IF WATER WELLS HAVE ACTUALLY BEEN AFFECTED) <br /> CHECK ONE ONLY <br /> ' ❑ NO ACTION TAKEN ❑ PFQ_WI ARY SITE ASSESSMENT WORKPLAN SUBMITTED ❑ POLLUTION CHARACTERIZATION <br /> Lw <br /> ULEAK BEING CONFIRMED ❑ PRELIMINARY SITE ASSESSMENT UNDERWAY ❑ POST CLEANUP MONITORING IN PROGRESS <br /> ❑ REMEDIATION PLAN ❑ CASE CLOSED(CLEANUP COMPLETED OR UNNECESSARY) 0 CLEANUP UNDERWAY <br /> CHECK APPROPRIATE ACTION(S) ❑ EXCAVATE&DISPOSE(ED) ❑ REMOVE FREE PRODUCT(FP) ❑ ENHANCED BIO DEGRADATION(IT) 1{ <br /> � SSV£�x Far onN.sl 1 <br /> z ❑ CAP SITE(CD) ❑ EXCAVATE 8 TREAT(ET) ❑ PUMP 6 TREAT GROUNDWATER(GT) REPLACE SUPPLY(RS) <br /> a LD <br /> M¢I CONTAINMENT BARRIER(CB) ❑ No ACTION REQUIRED(NA) ❑ TREATMENT AT HOOKUP(HU) ❑ VENT SOIL(v5} C <br /> c ❑ VACUUM EXTRACT(VE) CI OTHER(OT) <br /> Vi <br /> l <br /> qoL�w� <br /> �I <br />