My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011306
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1401
>
3500 - Local Oversight Program
>
PR0545145
>
ARCHIVED REPORTS_XR0011306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:24:00 AM
Creation date
1/9/2020 11:09:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011306
RECORD_ID
PR0545145
PE
3528
FACILITY_ID
FA0003820
FACILITY_NAME
VALLEY WHOLESALE DRUG
STREET_NUMBER
1401
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525031
CURRENT_STATUS
02
SITE_LOCATION
1401 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Gwg to eeal72d a lac. Page 11 <br /> Valley Wholesale Drag Company <br /> Project No 989 2 <br /> November 8,2004 <br /> The preliminary mass balance calculation, quantifying the amount MtBE remaining at the <br /> site, is included as Table 9 Roughly 0 075 gallons of MtBE remain beneath the VWDC site <br /> with approximately 0 041 gallons in the soil and approximately 0 034 gallons remaining in <br /> the groundwater <br /> ' 3.7 Remedial Technologies <br /> Other than natural attenuation, the original over excavation procedures and purging during <br /> well development and monitoring procedures, no formal remedial activities have taken place <br /> at the site <br /> ' <br /> Approximately 13 cubic yards of contaminated soil have been removed as drill cuttings <br /> pp Y <br /> during the installation of monitoring wells, soil borings and GeoProbe boreholes <br /> ' Approximately 500 gallons of contaminated groundwater per year are removed from the site <br /> dunng the development,purging and sampling of groundwater monitoring wells <br /> ' This volume of soil and groundwater removed during site investigation activities was not <br /> used to reduce the mass estimate of contaminants remaining at VWDC However, this is <br /> additional evidence of the conservative nature of the mass estimate calculations <br /> 3.8 BAT <br /> ' Since the tank and the primary soil contamination source have been removed, eventually <br /> background conditions will be achieved in the soil and groundwater at the site Excavation of <br /> the soil surrounding the former USTs and removal of soil boring cuttings are the only <br /> technologies employed to remediate the contamination detected at VWDC <br /> ' 3.9 Stockpiled Soil <br /> No stockpiled soil relating to the former underground storage tanks is stored on this property <br /> 3.10 Monitoring Wells <br /> Ten (10) monitoring wells are associated with this site and a well construction summary is <br /> included as Table 5 Upon issuance of a"No Further Action" letter from the CRWQCB, the <br /> monitoring wells will be properly abandoned under a SJCEHD permit <br /> Boring logs not used in generating this report may be found in <br /> • Hunter Interim Report Covering Soil and Groundwater Investigation—September, 1995 <br /> • Hunter Interim Report Covering Results of Site Investigaion Placement of SotUWater <br /> Probes—September 1998 <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.