Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICE'S <br /> MONITORING WELL FIELD LOG 2002 <br /> SAMPLE LOCATION MW- 4 DATE: 3/13/2002 <br /> ............................... ................. ..................... <br /> ........... .......... <br /> ..... . .. . <br /> . ...... ............... <br /> ............................... ......... ......... <br /> ..................... ...... <br /> ... ....... ........ ... ..... ..... ..................... <br /> PROJECT NAME: VALLEY WHOLESALE DRUG ANALYSIS PERFORMED: SEE CHAIN OF.CUSTODY <br /> ..................... <br /> ADDRESS: FREMONT STREET SAMPLE TIME: 15:26 <br /> CITY,STATE: STOCKTON,CA. SAMPLE CONTAINERS: 4 V.O.A.'S <br /> SITE CONTACT: PAUL SOUSA PRESERVATIVES: HCL <br /> I. CONSULTANT: HUNTER&ASSOCIATES LAB.ANALYSIS BY: SHERWOOD LABS <br /> .......... ......... . ............ .................... .......... . ......... <br /> ........... .. ............. <br /> .......... <br /> PROJECT MANAGER: BILL HUNTER MONUMENT: FLUSH <br /> SAMPLER: % DEL-TECH WELL CASING MATERIAL: PVC <br /> SIGNED: WELL CASING DIA. : 2'r 0.1632 <br /> SAMPLE MEDIA-._ GROUNDWATER P.I.D.READING/ODOR: NIA LT. FUEL <br /> TOP OF CASING ELEVATION: MSL COLOR: GREY TO CLEAR <br /> DEPTH TO WATER: ( et.100th's) 8.46 FEET CALL.PURGE VOL.: 2.75 GAL. <br /> DEPTH OF WELL: ffeet.100tli's25.34 FEET TOTAL VOLUME PURGED: 9 GAL. <br /> STANDING WATER COLUMN: 16.89 FEET DEPTH OF PUMP: N/A —FEET <br /> ..........W.I.... .... .. <br /> ... ............ ... ... ... ........ 7. <br /> .......... ........... .... <br /> FIELD PARAMETERS <br /> .............I. .... ..... ....... ....... <br /> .. ................ ............... <br /> TIME CUMULATIVE DRAW PUMPING pH E.C. TEMP.1 O.R.P. IDISSOLVEDI TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D.T.W.) (GPM/LPM) (units) (UMHOS) (Celsius) (Mvolts) (ppm) (N.T.U.) <br /> 0 NIA .5 GPM 7.32 1062 19.8 1 -10 NIA GREY <br /> 3 If 7.33 1020 20.1 -21 CLEAR <br /> 6 01 7.37 1044 19.9 -29 <br /> 9 7.33 1029 19.9 -33 <br /> PURGE METHOD: DEDICATED WATERRA PUMP. <br /> SAMPLE METHOD: DEDICATED TUBING. <br /> D.T.W.AFTER PURGE: D.T.W.AT SAMPLE TIME: 11.78' <br /> WELL INTEGRITY: CAP&SEAL ARE SECURE.LOCK INSTALLED. <br /> WELL LOCATION: <br /> REMARKS: <br /> WEATHER: CLEAR SKIES. WIND: NW5 <br /> QUALITY CONTROL: ALL PURGING EQUIPMENTAND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITHA STEAMCLEANER&ALCONOXSOAP• AlfVNITAILE GLOVES <br /> CONTAINMENT: D.O.T. 1755 GAL.STEEL DRUM OR 60 GAL.POLYDRUM. <br /> INSTRUMENTATION: Y.S-1.3560 FLOWCELL Y.S.I.DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 58013 P.I.D. <br /> KECK INTERFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT: WATER: SOIL: <br /> F_ <br />