My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:44:23 AM
Creation date
1/9/2020 11:30:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 7 <br /> HEALTH AND SAFETY PLAN ACKNOWLEDGMENT AND AGREEMENT FORM <br /> (All SECOR and subcontractor personnel must sign.) <br /> This Health and Safety Plan has been developed for the purpose of informing SECOR employees of the hazards they are <br /> likely to encounter on the project site,and the precautions they should take to avoid those hazards. Subcontractors and <br /> other contractors on the site must develop their own Health and Safety Plan to address the hazards faced by their own <br /> employees. SECOR has provided a copy of this Plan to contractors in the interest of full disclosure of hazards of which <br /> we may be aware, and to satisfy SECOR's responsibilities under the OSHA Hazard Communication standard. Similarly, <br /> contractors are required to inform SECOR of any hazards of which they are aware or that the contactor s work on site 1 <br /> might possibly pose to SECOR employees, including(but not limited to) the Material Safety Data`'Sheets for chemicals <br /> the contractor may bring on-site. This plan should NOT be understood by contractors to provide information on all of <br /> the hazards to which a contractors employeesmay be exposed as a result of their work. All parties conducting site <br /> activities are required to coordinate their activities and practices with the Project Health and Safety Coordinator. Your,# <br /> signature below confirms that you have read and understood the hazards discussed in this Plan, and understand that sub= <br /> contractors and contractors must develop their own Health and Safety Plan for their employees. I also understand I could <br /> be prohibited by the Site Health and Safety Coordinator or other SECOR personnel from working on this project for not+ <br /> complying with any aspect of this Health and Safety Plan. <br /> ae , <br /> -------------- <br /> aj - <br /> If <br /> a. <br /> i <br /> SECOR International Incorporated 23 ASP-driving <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.