My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:44:23 AM
Creation date
1/9/2020 11:30:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr i <br /> and safety program. For specific projects, the HSD is responsible for reviewing and approving <br /> P rovin <br /> the SSHP for acc1.7uracy PF <br />'F and incorporating new info ' <br /> tP information or o�utdelrnes which aid the PM and <br /> SSO in further definition and control of the potential health and safety hazards associated with <br /> the project. <br /> Project Geologist and Technician Responsibilities <br /> The project geologists and technicians are responsible for ensuring that all data acquisition is <br /> performed in accordance with the work plan (if applicable) and the SSHP, and that any deviations <br /> from the plans are based upon field conditions encountered and are well <br /> documented in the field <br /> notes. The project geologist and technician health and safety responsibilities include: <br /> I. Following the SSHP. <br /> 2. Reporting to the PM any unsafe conditions or practices. <br /> 3. Reportinb g <br /> to the PM all facts pertaining to incidents which result:in fn�ury or <br /> exposure to toxic materials. <br /> 4. Reporting, to the PM equipment malfunctions or deficiencies. <br /> SSO Responsibilities <br /> The SSO has on-site responsibility for ensuring that all team members, including subcontractors, <br /> comply with the SSHP. It is the SSO's responsibility to inform the subcontractors and other field <br /> personnel of chemical and physical hazards as he/she becomes aware of them. Additional SSO <br /> responsibilities include: <br /> 1. Providina site safety briefing for team members. <br /> 2. Updating procedures or equipment <br /> P res to be used on site based on new informa ' <br /> tion <br /> gathered during the site investigation. <br /> 3• Inspecting, all personal protective equipment (PPE) prior to on-site use. <br /> 4. Assisting the PM in documenting compliance with the SSHP by completing the <br /> standard BC forms. <br /> 5. Assisting in and evaluating the effectiveness of decontamination procedures for <br /> personnel, protective equipment, sampling equipment and containers,. and heavy <br /> equipment and vehicles. <br /> 6. Enforcing the "buddy system" as appropriate for site activities. <br /> 07ro993�EW7WISONORTHARCO <br /> k <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.