My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:44:23 AM
Creation date
1/9/2020 11:30:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Ile Attachment D <br /> Notice of Unsafe Conditions <br /> Contractor Date <br /> Project Name Project Number <br /> THIS NOTICE... <br /> This notice is to advise you,the prime Contractor on the above-named Contracts that this Representative-ofthe.. . <br /> Owner of the above-mentioned Project has observed (on the date shown above) an unsafe condition on the:Project::. <br /> These conditions are listed as follows:: <br /> ITEM CONDITION <br /> By this Notice,the Owner or its Representatives shall not assume any responsibility under the GENERAL CONDITIONS or <br /> assume any liability for the existence or correction thereof, for the unsafe conditions, or any others that may have been <br /> unnoticed. <br /> These conditions shall be remedied as soon as possible within a safe working period. if these corrections are not made,the <br /> Owner will be forced to remove ail field staff from the Job. No payment shall be made for any work installed after this date <br /> without first examination of work in accordance with the GENERAL CONDITIONS. <br /> Signature of Owner's Representative Title Date <br /> Received by(Signature of Contractor's Representative) Title Date <br /> BROWN and cuoweu Place a copy of completed form in project file. MS-19hm REV.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.