Laserfiche WebLink
• i ! <br /> DRAWING:5450_040805-2005 F2sumAwg XREFS: IMAGES: PLOT BY:RPTAYLOR-Jun 15,2005-9:11:22am <br /> DRAWING:JABP-ARCO}CADD%S45M2ndQ 051 <br /> k sA�TF <br /> BUILDING <br /> �k <br /> �k <br /> MW-2 <br /> 2� k <br /> 7,2 <br /> 7'2 k <br /> �X <br /> -- - k <br /> PUMP <br /> ISLANDS <br /> 0 MW-3 <br /> DRIVE �f Mw�i MW� �<o <br /> r` <br /> l<0.5 5° �o.s <br /> DR,vE <br /> LEGENDr <br /> 0 MW-2 MONITORING WELL LOCATION <br /> jjj MW-1 ABANDONED MONITORING WELL LOCATION Scale in Feet <br /> <50 GRO CONCENTRATION IN MICROGRAMS PER LITER(ug1L) <br /> <0.5 BENZENE CONCENTRATION IN ug/L <br /> <0.5 MtBE CONCENTRATION IN uglL FIGURE <br /> GROUNDWATER ANALYTICAL SUMMARY <br /> GRD-GASOLINE RANGE ORGANICS 2870 Getaway Oaks Drive,Ste.300 2 <br /> M1BE-METHYL TERT-BUTYL ETHER Sacramento,CA 85833.3200 ARCO Service Station NO.5450 <br /> TEL:(916)679-20001617 West Fremont Street ARCO Quarterly Groundwater ` <br /> SAMPLES COLLECTED ON 5!5!2005 FAX:(916)679-2900 Monitoring Report-2nd Quarter 2005 <br /> Stockton,California <br />