Laserfiche WebLink
11/�26/2001 11.'52 2094ge3433 FIFTH FLOOR <br /> ' PAGE 02 <br /> PUBLIC HEALTH S &;145 <br /> &W JOAQMIN COUNTY <br /> ENVIRONMENTAL HMLTH DIVISIONKaren Furst,M.D.,MTH_, Health Officer304 East WeerAvenue,Third Floor •Swrkton, CA 95202 <br /> 209/468-3420 <br /> PAUL SUPPLE <br /> ARCO PRODUCE'S COMPANY <br /> PO BDX 6549 <br /> MOP-AGA CA 94570 <br /> RE: AROQ AMPM#5450 <br /> 1617 W.Fremont St <br /> Stockton,CA 94570 <br /> WORKP 'AN "a DATED: 11/ /Ql <br /> PREPARED BY- R.�nrpmarional.Inc ' <br /> APPROVED <br /> DISAPPROVED <br /> ADDENDUM 0 Submit by.. <br /> ADEQUATE AND NECESSARY ELEMENTS OF TES WORKPLAN(FI&S 25299.37,subd.(c)(3)): <br /> 1. Advaaoemestt of three soft borings(SB 1.3)to a depth of 20 feet below surface <br /> Of c=taminutd,soil and to determine if grade(big}for delineation <br /> groundwater is impacted <br /> 2. Collect soil sampkes at five-foot intervals and a grab groundarater sample at total depth. <br /> 3. Laboratory analysis of sal and groundvmer samples for tool petroleum hydrocarbons,BTEX and fuel <br /> oxygena*compounds using proposed=Wlods. <br /> COA0UN i S AND CONDITIONS: <br /> I. Submit to PHS/EM a well permit application and nodfyPHS/EHD at least 48 hours prior to the <br /> proposed scheduled vork dams. <br /> 2. Complete FwM a=les 60 days from rhe date of this uotkplan approval. <br /> DATED <br /> Sam Savige EMS <br /> Cc: CVRWQCB—Marty Hartzell IAP/Site Mitigation Unit N _ <br /> SECOR International,Inc.—Rusty genkosley <br /> A Division of San Joaquin Counry Heahh Care Serves <br />