My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011188
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2900 - Site Mitigation Program
>
PR0505663
>
ARCHIVED REPORTS_XR0011188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 12:04:59 PM
Creation date
1/9/2020 11:52:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011188
RECORD_ID
PR0505663
PE
2950
FACILITY_ID
FA0006930
FACILITY_NAME
ARCO PRODUCTS CO #5450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
02
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/�26/2001 11.'52 2094ge3433 FIFTH FLOOR <br /> ' PAGE 02 <br /> PUBLIC HEALTH S &;145 <br /> &W JOAQMIN COUNTY <br /> ENVIRONMENTAL HMLTH DIVISIONKaren Furst,M.D.,MTH_, Health Officer304 East WeerAvenue,Third Floor •Swrkton, CA 95202 <br /> 209/468-3420 <br /> PAUL SUPPLE <br /> ARCO PRODUCE'S COMPANY <br /> PO BDX 6549 <br /> MOP-AGA CA 94570 <br /> RE: AROQ AMPM#5450 <br /> 1617 W.Fremont St <br /> Stockton,CA 94570 <br /> WORKP 'AN "a DATED: 11/ /Ql <br /> PREPARED BY- R.�nrpmarional.Inc ' <br /> APPROVED <br /> DISAPPROVED <br /> ADDENDUM 0 Submit by.. <br /> ADEQUATE AND NECESSARY ELEMENTS OF TES WORKPLAN(FI&S 25299.37,subd.(c)(3)): <br /> 1. Advaaoemestt of three soft borings(SB 1.3)to a depth of 20 feet below surface <br /> Of c=taminutd,soil and to determine if grade(big}for delineation <br /> groundwater is impacted <br /> 2. Collect soil sampkes at five-foot intervals and a grab groundarater sample at total depth. <br /> 3. Laboratory analysis of sal and groundvmer samples for tool petroleum hydrocarbons,BTEX and fuel <br /> oxygena*compounds using proposed=Wlods. <br /> COA0UN i S AND CONDITIONS: <br /> I. Submit to PHS/EM a well permit application and nodfyPHS/EHD at least 48 hours prior to the <br /> proposed scheduled vork dams. <br /> 2. Complete FwM a=les 60 days from rhe date of this uotkplan approval. <br /> DATED <br /> Sam Savige EMS <br /> Cc: CVRWQCB—Marty Hartzell IAP/Site Mitigation Unit N _ <br /> SECOR International,Inc.—Rusty genkosley <br /> A Division of San Joaquin Counry Heahh Care Serves <br />
The URL can be used to link to this page
Your browser does not support the video tag.