My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011197
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1800
>
2900 - Site Mitigation Program
>
PR0011061
>
ARCHIVED REPORTS_XR0011197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:22:17 PM
Creation date
1/9/2020 2:13:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011197
RECORD_ID
PR0011061
PE
2951
FACILITY_ID
FA0004656
FACILITY_NAME
NOR CAL BEVERAGE
STREET_NUMBER
1800
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
15307048
CURRENT_STATUS
01
SITE_LOCATION
1800 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9529891 P.06 <br /> NOR-CAL <br /> BEVERAGE CO., INC. <br /> M" STON[ elVfl. WEST MCt"LFIVTO. Ca 0]5-?_d T fvi4} VZ OOW FAX c9TA? vz ml <br /> September 4, 1991 <br /> RECEIVED <br /> SEP o 1991 <br /> Ms- Diane Hinson ENVIRONMENTAL HEALTH <br /> Public Health Services PERMIT/SERVICES <br /> Environment HCilth Division <br /> P. O. Box 2009 <br /> Stockton, California 95201 <br /> Dear tis. Hinson: <br /> We are in receipt of the letter from the PHS'EHD, signed by Laurie <br /> Cotulla and dated August 26, 1991 , <br /> We have had preliminary meetings with our consultants and we are <br /> now in the process of taking bids for the additional work required. <br /> We do not believe we can provide a formai work plan <br /> from our <br /> Consultants by: September 9, ( Z weeks from August 26) but should <br /> have thein submitted to you no later than September 27 , 1991 . <br /> • As a preliminary to the formal work plan td be submitted ltted by our <br /> consultants ou <br /> plans are as follows : <br /> 1 • We propose to install two additional monitoring wells to <br /> the south and south easterly directions from the <br /> excavation, <br /> 2. He propose to install two additional borings to test the <br /> extent of soil contamination in the; two location: of <br /> elevated contamination levels . One boring will be drilled <br /> at an angle through the contaminated section of the side <br /> wall to determine the extent that contamination may have <br /> spread to the adjoining property on the west side of our <br /> property. <br /> 3. Xf the borings indicates that soil removal is practical we <br /> Will plan on excavating and removing the remaining <br /> contaminated soil from the site. <br /> 4. The soil borings can later he converted to vapor <br /> extraction wells to conduct vaporextractSon tests to <br /> evaluate the potential of cleaning up soil in place, if <br /> this proceedure is deemed necessary or more practical than <br /> soil removal.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.