Laserfiche WebLink
Fh <br /> i <br /> a <br /> CONTENTS <br /> Tables and Illustrations ii <br /> 1 Introduction 1 <br /> 2 Background 2 <br /> 3 Scope of Work 3 <br /> 3.1 Exploratory Soil Boring 3 <br /> 3.2 Monitoring Well Installation 4 <br /> 3.3 Well Development and Ground-water Sampling 4 <br /> .ay l 1 <br /> ti 3.4 Sample Analysis 4 <br /> 4 Subsurface Conditions 6 <br /> 4.1 Soil 6 <br /> 4.2 Ground Water 6 <br /> 5 Analytical Results 7 <br /> 5.1 Soil 7 <br /> 5.2 Ground Water 7 <br /> 6 Conclusions and Recommendations 8 <br /> 7 References 9 <br /> Appendix A Exploratory Boring and Well Installation Procedures <br /> Appendix B Exploratory Boring Logs and Well Construction <br /> Details <br /> Appandlx C Certified Analytical Reports and Chain-of-Custody <br /> Records <br /> pjg1g05Vg050101d i Rev.0 July 2, 1991 <br /> mcon Associates <br />