My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1930
>
2900 - Site Mitigation Program
>
PR0527262
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:36:16 PM
Creation date
1/9/2020 2:26:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527262
PE
2950
FACILITY_ID
FA0018463
FACILITY_NAME
SWIFT ROOFING
STREET_NUMBER
1930
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
13336033
CURRENT_STATUS
01
SITE_LOCATION
1930 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Marge M. Comer Truy -3- <br /> workplan/Corrective Action Plan (CAP) before performing any work. This phasing <br /> process and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost- <br /> effective, efficient,'and timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective <br /> corrective action alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action <br /> alternative required by the regulatory agency to achieve the minimum cleanup <br /> necessary to protect human health, safety, and the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated <br /> immediate hazard-to public health, or the environment. Program-regulations-allow the - <br /> responsible party to undertake interim remedial action after: (1) notifying the regulatory <br /> agency of the proposed action; and (2) complying with any requirements that the <br /> regulatory agency may set. Interim remedial action should only be proposed when <br /> necessary to mitigate an immediate demonstrated hazard. Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation <br /> of the most cost-effective corrective action alternative. <br /> Three bids: Only corrective action costs required by the regulatory agency to protect <br /> human health, safety, and the environment can be claimed for reimbursement. You <br /> must comply with all regulatory agency time schedules and requirements and you must <br /> obtain three bids for any required corrective action. If you do not obtain three bids or <br /> a waiver of the three bid requirement, reimbursement is not assured and costs <br /> may be rejected as ineligible. <br /> If you have any questions, please contact me at (916) 341-7361. <br /> Sincerely, <br /> Lisa Labrado <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> 600 E Main Street <br /> Stockton, CA 95202-3029 <br />
The URL can be used to link to this page
Your browser does not support the video tag.