Laserfiche WebLink
0 • <br /> Location Map E A R T H =+1 T E c H Borehole/Well No: MW-3 <br /> @ Page 2 of 2 <br /> A tgCO INTERNATIONAL LTO.COMPANY <br /> Project Name: Tyco Electronics Fremont Street Project No.: 102790 <br /> Client: Tyco Electronics Corporation Borehole Depth: 20' <br /> Borehole Diameter: 3"/8" <br /> Driller: Gerard G.of RSI Start Date: 06/09/08 <br /> Drilling Equipment: Hand Auger/Geoprobe 6620DT combo rig Completion Date: 06/09/08 <br /> Location Description: Drilling Method: Hand auger/DPT and HSA Logged By: P.Dotson <br /> Sampling Method: Slide hammer/dual tube Checked By: B.Loebner <br /> $ � U <br /> Z o at :E a) <br /> E o Z E t& m T <br /> CL U o CL Q <br /> � C� Y <br /> Sample E o o a coo o o Litholo Remarks <br /> 9Y <br /> CLAYEY SILT:grayish brown(2.5YR 4/4);low plasticity,medium <br /> stiff;moist <br /> 16'grades to <br /> SILTY CLAY:dark yellowish brown(1 OYR 4/4);low plasticity;soft; <br /> moist <br /> 17.5 <br /> 17.5 CL 18.5-20' <br /> 930 4/4 plasticity and <br /> moisture content <br /> increase with <br /> depth. <br /> 19'grades to Wet @ 17.5'. <br /> ML CLAYEY SILT:dark grayish brown(2.5Y 4/2);some fine sand;low Complete boring- <br /> 1 <br /> zo <br /> plasticity;soft;wet to saturated at 0930. <br /> Total depth drilled-20'bgs. <br /> Total depth sampled-20'bgs. <br /> 22.5 <br /> 22.5 <br /> 25 <br /> 25 <br /> 27.5 <br /> 27.5 <br /> 30 <br /> 30 <br /> L:Iwork11027901genera11GWM ReporI12Q20080oring <br />