Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Dotson, Paul [paul.dotson@earthtech.com] <br /> Sent: Wednesday, June 11, 2008 3:42 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Revised site plan 1950 W. Fremont Street, Stockton, CA <br /> Mike, <br /> The three wells installed at 1950 W. Fremont St., Stockton, CA (MW-1 though MW-3) were constructed as <br /> follows: <br /> . 2"diameter, 0.020"slotted Sched. 40 PVC screen from 5 to 20 feet bgs; <br /> . 2"diameter Sched. 40 PVC blank casing 0.5 to 5 feet bgs; <br /> • #2J12 Monterey sand 4 to 20 feet bgs; <br /> . Bentonite chips 3 to 4 feet bgs (hydrated at least 30 minutes); <br /> . Cement grout 2 to 3 feet bgs; <br /> . Concrete and 8-inch diameter well box 0 to 2 feet bgs. <br /> . Well MW-1 had to be moved approx. 30 feet south of the proposed location and was not installed until <br /> Tuesday, June 10th. Several attempts were made to hand auger at the proposed location but the drillers <br /> could not get below approx. 1 foot bgs due to gravel and cobbles. <br /> Water was measured in well MW-3 at approximately 8 feet bgs a couple of hours after installation. Well <br /> development will be completed on Friday. Please let me know if you need more information or have questions. <br /> Paul <br /> 6/1 1/2008 <br />