Laserfiche WebLink
Location Map � <br /> E A R T H `) T E C H Borehole/Well No: MW-2 <br /> A tyCO INTERNATIONAL LTD.COMOANY Page 2 of 2 <br /> Project Name: Tyco Electronics Fremont Street Project No.: 102790 <br /> Client: Tyco Electronics Corporation Borehole Depth: 20' <br /> Driller: Gerard G.of RSI Borehole Diameter: 3"/8" <br /> Start Date: 06/09/08 <br /> Drilling Equipment: Hand Auger/Geoprobe 6620DT combo rig Completion Date: 06/09/08 <br /> Location Description: Drilling Method: Hand auger/DPT and HSA Logged By: P.Dotson <br /> Sampling Method: Slide hammer/dual tube Checked By: B.Loebner <br /> U <br /> C LL W <br /> E =O �' N Q d <br /> Q. <br /> V > <br /> Sample °' o 3 0 <br /> ID. of `° o U) of <br /> a m Lithology Remarks <br /> CLAYEY SILT:grayish brown(2.5YR 4/4);low plasticity,medium <br /> stiff,moist <br /> ' 16'grades to <br /> SILTY CLAY:dark yellowish brown(IOYR 4/4);low plasticity;soft; <br /> CL moist <br /> 17.s <br /> 17.5 <br /> 1158 4/4 18'grades to <br /> ' = SILTY SAND:dark yellowish brown(1 OYR 4/4);—50%fine sand at 18' <br /> SM to 70%fine sand at 20';30-50%non-plastic fines;loose;moist <br /> ' - Complete boring <br /> at 1158. <br /> 20 <br /> Total depth drilled-20'bgs. <br /> ' Total depth sampled-20'bgs. <br /> 22.5 22.5 <br /> 25 25 <br /> 27.5 <br /> 27.5 <br /> ' 30 30 <br /> L:4orkV 017901genera11GWM ReportUQ20081ftring <br />