My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:05:48 PM
Creation date
1/9/2020 2:58:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br /> STOCKTON CITY CAB CO Page l of 2 <br /> Path to Closure Plan " [201 GEOTRACKER HOME I MANAGE PROJECTS REPORTSSEARCH I LOGOUT <br />� <br /> STOCKTON CITY CAB CO (70607700882 MAP THISVIE) - ______ OPEN - SRE ASSESSMENT <br /> 2085 FREMONT ST E CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON , CA 95297 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP ILFAO) - CASE#: 1117 <br /> CASEWORKER: ANGELICA SANDOVAL MARIN - SUPERVISOR: ADRIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC VVEBPAGE CENTRALVALLEY RVJOCB (REGION 63) - CASE#: 391066 <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SUE CASEWORKER JdAMES BARTON - SUPERVISOR: CORI CONDON <br /> CUP Claim It 14821 CUF Priority Assigned: B CUP Amount Paid: ST31460 <br /> THIS PROJECT WAS LAST MODIFIED BY ANGELICA SANDOVAL MARIN ON 12119/20134:11 :33 PM - }1L�= <br /> THIS SITE HAS SUBMITTALS. CLICKIJ• ERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF IFIW2013 PATH TO CLOSURE HISTORY CLEAR I RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT I : <br /> General Criteria E: A conceptual site model that assesses the nature, extent, and mobility of the release 171 Procedural Impediment - INRo <br /> has NOT been developed <br /> Step to Resolve Impediment 1 - Step 1: - DELETE STEP <br /> ittal of conceptual site model (Csll) or a list or reports containing the necessary cmg information. COMPLETION DATE <br /> PROJECTED DAM CTUALDATE <br /> 6/302014 1F1812m3 <br /> ADD APDI110NAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable ❑ Procedural Impediment - INRo <br /> Step.to Resolve Impediment 2 - Step 1: - DELETE STEP <br /> COMPLETION DATE <br /> ntinue soil Vapor extraction (sve) remediation. <br /> '.. <br /> PR TE PROJECTED ACTUAL <br /> E <br /> 12/3012015 1WISC013 <br /> Step to Resolve Impediment 2 - Step 2: - DELETE STEP <br /> COMPLETION DATE <br /> Implement and operate the approved ozone injection systmu- PROJECTED DATEALDATE <br /> 12302015 1F1&2013 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria: Groundwater: The contaminant plume that exceeds water quality objectives is r! Procedural Impetliment - I_ <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length (That Exceeds Water Quality Objectives): Unknown - <br /> • Benzene Concentration: 2: 1,000 pg/I and < 3,000 pg/l <br /> • Nearest Supply Well (From Plume Boundary): Unknown <br /> Step to Resolve Impediment 3 - Step 1: - DELETE STP <br /> COMPLETION DATE <br /> Prepare and submit a sensitive receptor suryy. PROJECTED OATS LDATE <br /> 12302014 A1F182m3 <br /> Step to Resolve Impediment 3 - Step 2: - DELETE STEP <br /> Prepare and submit a workplan to complete dissolved plume delination . COMPLETION DATE <br /> PROJECTED DATE ACTUALDATE <br /> 121302014 12/102013 .. _ _ <br /> _ I <br /> Step to Resolve Impediment 3 - Step 3: - DELETE STEP <br /> 1 mens work plan and submit report of findings . COMPLETION DATE <br /> O 8CTUALDATE <br /> PROJECTED <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 4: <br /> Media Specific Criteria: Petroleum Vapor Intrusion to Indoor Air: The site is NOT considered low-threat for 17 Procedural Impediment - moo <br /> the vapor-intrusion-to-air pathway and site-specific conditions do NOT satisfy items 2a, 2b, or 2c . <br /> Conditions that do not meet the policy criteria: <br /> • TPH in the Bioattenuation Zone: 2100 mg/kg <br /> • Bioattenuation Zone Thickness: < 5 Feet (No BioZone) <br /> • 02 Data in Bioattenuation Zone: No 02 Data <br /> • Benzene in Groundwater: 21,000 pg/l <br /> • Soil Gas Benzene: Unknown <br /> • Soil Gas EthylBenzene: Unknown <br /> • Soil Gas Naphthalene: Unknown <br /> Step to Resolve Impediment 4 - Step 1: - DELETE STEP <br /> COMPLETION GATE <br /> PROJECTED DATE �ACTI�IAL DATE <br /> 613012014 I <br /> https ://geotracker.waterboards.ca.gov/regulators/screens/closure_Tolicy.asp?global_id=T. . . 12/19/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.