My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:04:31 PM
Creation date
1/9/2020 2:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d YV <br /> 1117 Lone Palm Avenue, Suite Modesto, CA 953511 <br /> www.atcassociates.com <br /> 209-579-2221 <br /> ASS( A kT C <br /> O C I ATE S I N C . Fax 209-579-2225 <br /> Environmental, Geotechnical and Materials Engineers <br /> Report Preparation <br /> Upon completion of the field activities, a report will be prepared describing the field activities and <br /> laboratory analytical results and will include an assessment of the extent of the petroleum hydrocarbon <br /> release along with recommendations for additional investigation activities if warranted. The report <br /> will be prepared in general accordance with CRWQCB reporting guidelines. <br />'i <br /> All work described in this workplan will be performed under the direction of a California Registered <br /> Professional Engineer or California Registered Geologist. All work will be performed in accordance <br /> with ATC ' s Site Specific Health and Safety Plan (HASP) and Quality Control/Quality Assurance Plan <br /> on file with the SJCEHD. <br /> Projected Schedule <br /> I <br /> i <br /> Once approval of this workplan has been received, ATC will work to obtain an access agreement to <br /> install the proposed off-site wells to the southeast and confirm a schedule for drilling activities. ATC <br /> will notify the SJCEHD at least 48 hours prior to beginning any field activities. The summary report <br /> will be submitted to the SJCEHD approximately four to six weeks after the completion of field <br /> activities. <br /> If you have any questions or require additional information regarding this workplan, please contact us <br /> at (209) 579-2221 . <br /> S,,pNAL GFO <br /> Respectfully submitted, �5 � <br /> ATC Associates Inc. p <br /> a TODD G HAFNER <br /> Na 8080 <br /> p� T R <br /> Todd Hafner, P.G. OFC <br /> CA Professional Geologist No . 8090 <br /> Attachments <br /> cc : Mr. Ernest Foppiano <br /> Mr. Jim Barton, CRWQCB <br /> S:\Environmenta1\28349*kp.doc 5 ATC Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.