Laserfiche WebLink
d YV <br /> 1117 Lone Palm Avenue, Suite Modesto, CA 953511 <br /> www.atcassociates.com <br /> 209-579-2221 <br /> ASS( A kT C <br /> O C I ATE S I N C . Fax 209-579-2225 <br /> Environmental, Geotechnical and Materials Engineers <br /> Report Preparation <br /> Upon completion of the field activities, a report will be prepared describing the field activities and <br /> laboratory analytical results and will include an assessment of the extent of the petroleum hydrocarbon <br /> release along with recommendations for additional investigation activities if warranted. The report <br /> will be prepared in general accordance with CRWQCB reporting guidelines. <br />'i <br /> All work described in this workplan will be performed under the direction of a California Registered <br /> Professional Engineer or California Registered Geologist. All work will be performed in accordance <br /> with ATC ' s Site Specific Health and Safety Plan (HASP) and Quality Control/Quality Assurance Plan <br /> on file with the SJCEHD. <br /> Projected Schedule <br /> I <br /> i <br /> Once approval of this workplan has been received, ATC will work to obtain an access agreement to <br /> install the proposed off-site wells to the southeast and confirm a schedule for drilling activities. ATC <br /> will notify the SJCEHD at least 48 hours prior to beginning any field activities. The summary report <br /> will be submitted to the SJCEHD approximately four to six weeks after the completion of field <br /> activities. <br /> If you have any questions or require additional information regarding this workplan, please contact us <br /> at (209) 579-2221 . <br /> S,,pNAL GFO <br /> Respectfully submitted, �5 � <br /> ATC Associates Inc. p <br /> a TODD G HAFNER <br /> Na 8080 <br /> p� T R <br /> Todd Hafner, P.G. OFC <br /> CA Professional Geologist No . 8090 <br /> Attachments <br /> cc : Mr. Ernest Foppiano <br /> Mr. Jim Barton, CRWQCB <br /> S:\Environmenta1\28349*kp.doc 5 ATC Associates Inc. <br />