My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:04:31 PM
Creation date
1/9/2020 2:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ether (ETBE) di-isopropyl ether (RIPE), tertiary amyl ether (TAME), tertiary butyl ether (TBA), 1 ,2- <br /> dichloroethane ( 1 ,2-DCA), and 1 ,2-dibromoethane (EDB) utilizing EPA Method 8260B. <br /> Report Preparation <br /> Upon completion of the field activities, a report will be prepared describing the field activities and <br /> laboratory analytical results and will include an assessment of the extent of the petroleum hydrocarbon <br /> release along with recommendations for additional investigation activities if warranted. The report <br /> will be prepared in general accordance with CRWQCB reporting guidelines. <br /> All work described in this workplan will be performed under the direction of a California Registered <br /> Professional Engineer or California Registered Geologist. All work will be performed in accordance <br /> with ATC' s Site Specific Health and Safety Plan (HASP) included in Attachment 1 , and the Quality <br /> Control/Quality Assurance Plan included in Attachment 2. <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will work to obtain an access agreement to <br /> install the proposed off-site well to the east, contact Stratus regarding access to the Apache Plastics <br /> wells previously referenced, and confirm a schedule for drilling activities. ATC will notify the <br /> SJCEHD at least 48 hours prior to beginning any field activities. The summary report will be <br /> submitted to the SJCEHD approximately four to six weeks after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please contact us <br /> at (209) 579-2221 . <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> /Z <br /> .�,' <br /> Todd Haf tier, P .G. % + ' � �, <br /> Professional Geologist {sr�� .x <br /> a � m <br /> oIN <br /> til n <br /> lenne Homsey, P.E. + . <br /> CA Registered Civil Engineer No . 47410 <br /> Nbo <br /> •`;.rte... u.� <br /> Attachments <br /> cc: Mr. & Mrs. Ernest Foppiano <br /> Mr. Jim Barton, CRWQCB <br /> S:\Environmenta1\28349\wkp.doc 5 ATC Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.