My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2900 - Site Mitigation Program
>
PR0506171
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 4:31:53 PM
Creation date
1/9/2020 4:19:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0506171
PE
2950
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
02
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ..r <br /> Shell Oil Sites <br /> Page 3 <br /> 2494 Fremont Street Stockton <br /> Access to the property to the north of this site has not been obtained so the ground water <br /> investigation in that direction has not been conducted. Shell is to continue their site investigation. <br /> 2375 Grant Line,Tracy <br /> EHD agrees with Shell that the methyl tert butyl ether(MTBE) detected in samples from monitoring <br /> well MW-4,appears to be from the 2360 West Grant Line Road(7-Eleven) site located directly south <br /> (down-gradient) of the Shell site. However,water from MW-1 has the highest MTBE <br /> concentrations and that contamination appears to be from an on-site source. <br /> Since the Highway 205 on-ramp is located directly north and down-gradient of MW-1,additional <br /> investigation to define the lateral extent down-gradient of the contamination and to determine the <br /> total mass of the plume may be difficult Shell agreed to explore the possibility of conducting a dual- <br /> site groundwater treatment with 2360 West Grant Line Road and/or providing a model of the <br /> contamination to evaluate the potential for migration and impact. Shell will submit a monitoring <br /> well installation/contamination investigation report by the end of this month Qune 2005). <br /> 1071 Main Street.Manteca <br /> EHD was informed that Cambria had created a site model and the results did not support site <br /> closure. EHD recommended that Cambria use good professional judgment to support why the <br /> model may not be correct. Cambria agreed to prepare a site closure report(discussed in the Tri- <br /> Regional Board Staff Recommendations dated April 16,2004). <br /> 341 Main Street,Ripon <br /> A closure report for this site was provided at the meeting. <br /> 7700 Moreland Street Stockton <br /> Eight monitoring wells have been installed to investigate the MTBE in the soil and groundwater. <br /> The lateral extent of the shallow contamination has been defined. An EHD permit has been issued <br /> for the installation of a deeper monitoring well to investigate the vertical extent of the <br /> contamination. Quarterly groundwater monitoring/sampling of the monitoring wells will continue <br /> to demonstrate that the MTBE concentrations in the groundwater are still declining. Analysis for <br /> methanol, ethanol,EDB and 1,2-DCA will be performed on the water samples to determine if these <br /> contaminants are present in the groundwater. <br /> 6131 Pacific Avenue.Stockton <br /> There has been a lack of progress at this site with focus on minor contamination in offsite lateral <br /> wells rather than remediation of the major onsite contaminant problem. EHD has directed that <br /> interim remediation of the on-site source area soil contamination be performed,but to date interim <br /> remediation has not been performed. It was discussed that dual phase extraction should be <br /> performed as interim remediation and that language should be included in the Corrective Action <br /> Plan to be submitted by September 9,2005,that if DPE is successful it will be the alternative for the <br /> final remedial action. <br /> 3725 Tracy Blvd.Tracy <br /> An SCM is to be prepared for this site. Further delineation of the contamination may be required. <br /> Quarterly groundwater monitoring/sampling of the monitoring wells will continue to demonstrate <br /> that the MTBE concentrations in the groundwater are still declining. Analysis for methanol,ethanol, <br /> EDB and 1,2-DCA will be performed on the water samples to determine if these contaminants are <br /> present in the groundwater. The Record Title Owner information should be updated if ownership <br /> of the facility has changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.