Laserfiche WebLink
CAB R I A <br /> only analysis Should fuel oxygenates other than MTBE be detected in this well, the need for <br /> continued fuel oxygenate analysis will be evaluated <br /> Report Preparation• Following the receipt of analytical results from the laboratory, Cambria <br /> will prepare a written report which will include field procedures, laboratory results, boring <br /> logs, conclusions, and recommendations <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered geologist <br /> SCHEDULE <br /> Cambria is prepared to begin work upon written approval of this work plan by SJCPHS/EHD <br /> and receipt of an appropriate drilling permit <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Joe Neely at (707) 935-4854 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> OD G p <br /> 0 <br /> Joe W Neely, RG <br /> Senior Project Geologist <br /> RG 6927 No 6927 e <br /> Attachments CFCp,�1FD <br /> Figure I Site Vicinity Map <br /> Figure 2 Site Plan/Proposed Well and Boring Locations <br /> cc Ms Karen Petryna, Equiva Services LLC <br /> Mr Mark List, Central Valley Regional Water Quality Control Board <br /> 241-0797 7 <br />