Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> Project 4. Client- <br /> Sampler StartDate• <br /> Well I D — Well Diameter 2 3 4 6 S <br /> Total Well Depth Depth to Water 7 �3 <br /> Before After- Before After <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to vc Grade D O Meter (1f req d) YS1 HACH <br /> Purge Method Bailer Sampling Method Bailebg=70 <br /> Disposable Bailer Disposable Bailer <br /> b iiddleburg Extraction Port <br /> Electric Subniersible_� Other <br /> Extraction Pump <br /> Other' Well Diameter Multiplier Well Diameter Multi her <br /> 2" 016 5" 102 <br /> —fit �(Gals )X _ Gals o 37 6' 1 47 <br /> 1 Case Volume Specified Volumes Calculated Volume 065 other rad�usl'0 163 <br /> Time Te>np (°F) pH Coad Turbidity Gals Removed Observations <br /> ISq (o <br /> I C3 4 <br /> Did well dewater? Yes Gallons actually evacuated 9 <br /> - <br /> Sampling Time 12 Sampling Date- -1 E3--00 <br /> Sample I D - r Laboratory <br /> Analyzed for �-G- BTF_ NnrBE TPH-D Other- CK 24v0 <br /> Equipment Blank I D Time Duplicate I D <br /> Analyzed for- TPH-G BTE: tvrrBE TPH-D Ot11er <br /> DO (if req'd)• Pre-purge Mg L Post-purge rligk <br /> _ <br /> ORP (if req'd) P?e-❑urE�e �l;'`� �'QSY-��LIrQ� 111V <br /> -= <br />