My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 9:42:17 AM
Creation date
1/10/2020 8:49:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICA' <br /> Project Location 3503 Navy Dr. , Stockton , CA 95206 <br /> Owner S.T. Services Phone No. (209)943-5662 <br /> Contractor <br /> Jim Thorpe Oil , Inc. phone No. (209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> and t kslpipes made of poly resin;lass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (o� cubic yards per 1000 ;anon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Jim Thorpe Oil , Inc. <br /> Name (Print) <br /> * Contractor <br /> Jim int; Inc. <br /> By * <br /> ignatur <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.