My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 9:42:17 AM
Creation date
1/10/2020 8:49:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gloves and coveralls will be placed in a drum on-site for disposal. No one will exit the site with <br /> contaminated clothing or equipment. <br /> EMERGENCY RESPONSE <br /> If the potential exists for fire, explosion or toxic material release during on-site activities, prior to <br /> commencement of any activities, personnel will have available telephone numbers and contacts for <br /> emergency response assistance including. <br /> • Ambulance <br /> • Fire Department <br /> • Hospital <br /> • Poison Control Center <br /> • Community Evacuation Contact <br /> `-- Emergency equipment on-site will include:— - <br /> • Portable eyewash bottles <br /> • Industrial first-aid kit <br /> SITE SECURITY <br /> Access during all on-site activities will be restricted to authorized personnel. All personnel and <br /> authorized visitors must contact the Safety Coordinator/Project Manager prior to entering and exiting the <br /> site. <br /> i <br /> RECORD KEEPING <br /> All site safety records pertaining to the site characterization study will be maintained by the Safety '. <br /> Coordinator/Project Manager throughout the project. <br /> AIR MONITORING <br /> The Safety Coordinator/Project Manager will conduct periodic air monitoring using direct reading r <br /> sampling equipment as required. At a minimum the following monitoring will be performed: <br /> Total Organic Vapors <br /> A direct reading photoionization detection (PID) meter g-INU PI 101 or equivalent) will be <br /> used to monitor the concentrations of organic vapors in the work area. Measurements will be <br /> taken at least once every 15 minutes during surface and subsurface sample collection. The <br /> meter will be calibrated for benzene. Total organic vapor measurements will be used to <br /> determine the appropriate levels of respiratory protection and conditions for site evacuations. <br /> Total organic vapor concentrations in the workers' breathing zone in excess of 10 ppm above <br /> background will trigger an upgrade from level D to level C protection. Breathing zone <br /> concentrations in excess of 250 ppm will stop the work on-site until the work zone <br /> concentrations are reduced to below 250 ppm. <br /> EMPLOYEE TRAINING AND INFORMATION <br /> All personnel working have completed the certified, 40-hour OSHA hazardous waste training course, <br /> and have been trained in the following objectives: <br /> • Workers are aware of potential hazards they may encounter. <br /> • Knowledge and skills necessary to perform the work with minimal risk to workers' health and <br /> safety. <br /> • Familiarization with the Site Safety Plan and site-specific requirements. <br /> The training plan for this site encompasses: <br />
The URL can be used to link to this page
Your browser does not support the video tag.