My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5400
>
2800 - Aboveground Petroleum Storage Program
>
PR0545140
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
1/10/2020 9:28:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545140
PE
2832
FACILITY_ID
FA0025200
FACILITY_NAME
CECCHINI TRUCKING CO INC, CTC CFC
STREET_NUMBER
5400
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05516072
CURRENT_STATUS
01
SITE_LOCATION
5400 W HWY 12
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOARIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: I Facility Address: Data: <br /> CECCHINI TRUCKING CO INC 5400W HWY 12 . LODI January 03, 2020 <br /> Qualified Facility-Tier 1 <br /> 404 CFR 112.6(a)(3)(II) No 2CT for bulk containers,or mobile storage containers not located to prevent discharge .V .R .COS <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described In Plan,or tested .V .R .COS <br /> Qualified Facility-Tier II <br /> 501 CFR 112.6(.X1), Tier Il Qualified Facility Plan not certified by the owner or a PE,as required .V .R .COS <br /> T12.6(b) <br /> 502 CFR 112.61 Tia 11 Qualified Facility Plan technical amendment not certified by Ite owner or a PE o o oCOS <br /> Sol CFR 112.6(bX3), Felure to have a PE certify in writing alternative measores for a Tia 11 Qualified Facility o o oCOS <br /> 112.6(b X4) <br /> 504 CFR 112.6(b)(4)(I) Failure of owner to assure that a PE makes all required attestations In a Tier 11 Plan o d oCOS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including.proseerederending section o oR .COS <br /> 602 CFR 112](.X2) Ran failed to discuss equivalent environmental protectim,if applicable o o oCOS <br /> 603 CFR 112](.X3) Failed to adequately describe the physical layout ofthe facility In the Plan o o oCOS <br /> 800 CFR 112](is i) Ran failed to include oil type and storage capacity for each container o o oCOS <br /> W5 CFR 112.7(aX3)(ii) Ran failed to adequately discuss discharge prevention measures,including roseate harMkg o o oCOS <br /> 606 CFR 112.7(aX3)(iii) Ran failed to adequately discuss facility drainage or drainage controls o o oCOS <br /> 607 CFR 112](is iv) Ran failed to include countermeasures for discharge discovery,response and cleanse o o oCOS <br /> 608 CFR 112.7(lsi Ran failed to add read disposal meth ods for recovered ma'aate o o oCOS <br /> 609 CFR 1127(.X3vt), Ran fared to adequately contain procedures for redidng a discharge o o oCOS <br /> 112.7(.4) <br /> 610 CFR 112](.X5) Discharge procedures are not adequately addressed lfthe faciNty has no response pan o o oCOS <br /> 611 CFR 112.7(b) Ran failed to include a description ofpotertial equipment failure or protide equivalence o o oCOS <br /> 612 CFR 112.7(c) Ran failed to include secondary containment,diversionary structures,or equip to prevent discharge o o oCOS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment o o oCOS <br /> 614 CFR 112](4) PE certified Plan failed to explain Impracticability of contain menVtllversion ary structures o o oCOS <br /> 615 CFR 112](4) Farure to perform integrity and leak testing when claiming secondary containment impracteral o o oCOS <br /> 616 CFR 112.7hil Failure to prepare an oil spill contingency plan when claiming Impracticability of structures o o oCOS <br /> 617 CFR 112.7hil Wmitten commitment of manpower,equipment,and materials to control and remove oil discharge o o oCOS <br /> 618 CFR 112.7(e),112.8(c) Fated to keep records of procedures,ingrerliare,and tests for Mree yenre o V o R o COS <br /> (e), <br /> 619 CFR 112.7ni Failed to been personnel on all discharge prevention details rated in this section o o oCOS <br /> 620 CFR 112.7ni Failed to designate a person accountable for discharge prevention o o oCOS <br /> 621 CFR 112.7ni Failure to include In the SPCC Plan an adequate description of employee training o V o R o COS <br /> 622 CFR 112.7ni Failure to conduct complete annual discharge prevention briefings for oil-handling personnel d o oCOS <br /> 623 CFR 112](8) Ran failed to address security of site and valves,lock oaaey out,and lighting o o oCOS <br /> 624 CFR 112.7(g) Facility failed to Implement security ofske ant valves,lock outhag out,and lighting o o oCOS <br /> 625 CFR 112.7(h) Ran fated to adequately discuss fral tank ca and tank muck,loadiaglunloadmi,rack o o oCOS <br /> FMOCI PROW140 50001 011032021 <br /> EH018U1 Rcr.&20i Page 2 of Abowr J Peartlam Storage AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 488-3420 1 F 209 4840138 1 w .sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.