My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
R A BRIDGEFORD
>
7850
>
2231-2238 – Tiered Permitting Program
>
PR0521782
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 9:52:56 AM
Creation date
1/10/2020 9:38:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521782
PE
2236
FACILITY_ID
FA0014789
FACILITY_NAME
SJC PERMANENT HOUSEHOLD HAZ WASTE
STREET_NUMBER
7850
Direction
S
STREET_NAME
R A BRIDGEFORD
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7850 S R A BRIDGEFORD ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BAGLEY ENTERMSES, INC. <br /> "LIQUID HANDLING SOLUTIONS" <br /> 2370 Maggio Circle,Unit#4,Lodi,CA 95240-8828 <br /> T#:(209)367-4800 ft(209)367-5424 <br /> Web Site:www.bagipyentganises.com <br /> Contractor's License#774802 <br /> SB-DVBE 1071742 <br /> SDVOSB <br /> AST PRESSURE TEST RECORD <br /> TEST NUMBER: ONE PROJECT NO.: 17-205 PAGES : 1 OF 1 <br /> PROJECT NAME: <br /> San Joaquin County House Hold Hazardous Waste Consolidation Facility <br /> TEST INFORMATION _ <br /> SYSTEM DESCRIPTION: <br /> Split 5001500 Gallon Used Motor Oil Storage Tank and Collection System <br /> DESCRIPTION OF TEST BOUNDARIES: <br /> Pressure test primary tank in accordance with manufacturer recommendations(Containment Solutions Inc.)and industry <br /> standard practices. <br /> TEST METHOD: PRESSURE <br /> TEST RE UIREMENTS <br /> REQUIRED TEST PRESSURE: 3 PSIG TEST FLUID TEMPERATURE: N/A <br /> REQUIRED TEST DURATION: 1.0 HOUR AMBIENT TEMPERATURE: NIA <br /> TEST RESULTS <br /> TEST DATE: 10/02/2017 START TIME: 10:30 AM <br /> PASSED/FAILED:Passed FINISH TIME: 11:30 AM <br /> ACTUAL GAUGE PRESSURE: 3 PSIG <br /> TEST E UIPMENT <br /> TYPE: RANGE: CAI..DATE: CAL.DUE: <br /> CALIBRATED 0-15 PSIG January 1"2017 January I s'2018 <br /> DIAPHRAGM <br /> REMARKS:Pressure tested primary tank at 3 psi and secondary tank at 2 psi,soaped down all welds while testing. Tank meets <br /> current standards to comply with CSI tank installation guide. <br /> TEST ACCOMPL HED <br /> SIGNAT DATE: October 3rd 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.