Laserfiche WebLink
Pressure Water <br /> Waste Water <br /> fromoutside <br /> Premier Finishing <br /> Schematic Flow Diagram Incoming Water <br /> Process#2 chem line supply <br /> ra^ zr r a'r 21.1 <br /> T <br /> t- _ <br /> TANK A TANK 8 2to <br /> TANK 2 TANK 3 TANK 4 TANK 5 TANK 6 TANK 7 TANK 8 TANK 9 Sump TANK 11 TANK 12 <br /> Running Alumate Running Deoxidizer Running 350 Gal. Hot Water pump Rinse Macdermi TANK 13 TANK 14 <br /> 12'4^ Net, Rinse Rime Etch Rinse 710 Rinse <br /> Dimension w/aglraaon Currently Rina Rinse Tank NCP Rime MMalast <br /> Supreme 350 GaL 350Ga1. 3SGGal. 350 Gal. 350Ga1. Empty 350 Gail. O 350 Gal. 350 Gal. emPc/ TCP-HF350 Gal. <br /> ra®r, ANK 12 SS Gal. 55 Gal.(D ® 0 I3�® (D © ® Qi /43" <br /> OO © 7,a" <br /> 2.13• T <br /> l'3• <br /> Process Transfer <br /> Containment Wall 51,a• 9'2^ �a•r —� <br /> 3•wxs'Lxr DTanks l-u 3'Wx5'Lx3'DTanks <br /> 30^WxS Lx 30•DTank 12 ONLY Tank ume approximately 350 gallons(@ 7.+8 gallons f:3) <br /> NOW:Men changing the processing chemicals aaidethetank or replenishing lost water,use delonlaed water. �-Represents the containment wall <br /> P:\Safery and Enviromennr\Enviro\Haz Waste Treatment Permit\Process 2{hemline Conversion 08-21-2019(CX Edit 01).ai <br />