Laserfiche WebLink
Monitoring System'Certification-Page 2 of 3 <br /> Site Address: 3505 Navy Dr. Date of Testing/Servicing: 712/10 <br /> D. Results of Testing/Servicing <br /> Software Version Installed_ 00 .� <br /> Complete the foliowin checklist: <br /> Wlris ❑ No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> WV;­ ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> WY—es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ I�p* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> /A operational') <br /> ❑ Yes ❑ N * For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> UA monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes ❑ No <br /> ❑ Yes * For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> XA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> IIIpoint(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* o Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> s ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if applicable.) <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />