Laserfiche WebLink
` 4I <br /> CHRONOLOGY <br /> Diesel Performance <br /> 2804 Fremont Street <br /> Stockton, CA 95205 <br /> 02/20/87 One 3,000-gallon underground storage tank was removed this date under San <br /> Joaquin County Environmental Health Department (EHD) permit and inspection. <br /> One soil sample for laboratory analysis was collected from beneath the tank. <br /> 09/13/88 Analytical results from the soil sample collected beneath the tank was submitted <br /> to the EHD on this date. The results were positive for petroleum hydrocarbons. <br /> 09/14/88 Unauthorized Release Report was filed this date. <br /> 11/20/96 "Notice of Reimbursement" sent this date to responsible party Diesel <br /> Performance at site address. <br /> 07/23/97 A site investigation began with the installation of five soil borings. See Smith's <br /> report Summary Report for Subsurface Investigation dated October 20, 1997 <br /> available on Questys. <br /> 09/25/98 One groundwater monitoring well, MW-1, was installed this date. See ATC's <br /> report Summary Report of Additional Subsurface Investigation dated <br /> January 8, 1999, available on Questys. <br /> 12/14/99 Three groundwater monitoring wells, MW-2 through MW-4, were installed this <br /> date. See ATC's Summary Report of Additional Subsurface Investigation dated <br /> February 24, 2000, available on Questys. <br /> 12/05/01 Three groundwater monitoring wells, MW-5 through MW-7, three vapor extraction <br /> wells, VEW-1 through VEW-3, and one cone penetrometor test boring, CPT-1, <br /> were installed beginning this date. A soil vapor extraction (SVE) pilot test was <br /> subsequently run on the vapor wells. See ATC's report Remedial Investigation <br /> and Feasibility Study dated November 19, 2002, available on Questys. <br /> 10/15/04 Periodic interim remediation SVE events began this month. See ATC's report <br /> Remedial Activity Summary Report dated June 18, 2005, available on Questys. <br /> 01/17/07 A permanent SVE remediation system began operation this date. Reports of <br /> system performance were submitted quarterly by ATC; available on Geotracker. <br /> 02/13/09 The SVE system was shut down due to low influent volatile vapor concentrations. <br /> ATC estimates that 5,436.78 pounds of TPHg, and 823.39 pounds of benzene, <br /> toluene, ethylbenzene and xylenes were removed from the subsurface during the <br /> 16,500 hours of system operation. <br /> 07/14/09 The SVE system was re-started to conduct a rebound test. The results of the test <br /> indicated it would not be cost effective to operate the system further. See ATC's <br /> report Rebound Test Report, submitted to Geotracker on February 21, 2010. <br /> 10/11/10 ATC submitted Case Closure Report this date, available on Geotracker. <br /> 01/20/11 Soil vapor samples were collected this date for laboratory analysis. A report was <br /> submitted on 416111, available on Geotracker. <br />