My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 10:58:13 AM
Creation date
1/13/2020 10:44:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 3 � <br /> v <br /> I <br /> ASSOCIATES I NC . <br /> I <br /> I <br /> Va or and Groundwater Saar le Collection <br /> i <br /> Vapor samples will be collected through a 1/4-inch Teflon sample fine connected to a stainless steel <br /> wellhead fitting, and.will be collected in Tedlar sample bags. Teflon tubing will be used to minimize <br /> sample loss through adsorption and the possibility of distorted results from sample lines contaminated <br /> by previous test runs. <br /> Report Preparation <br /> Upon completion of the well installation and development activities, a summary report will be <br /> prepared for submittal to PHS/EHD. The report will include a description of all field activities, 1 <br /> vapor extraction test results, laboratory-analytical results, well/boring logs, and recommendations. <br /> i <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) and Quality Control/Quality Assurance Plan, which are on file for this site with <br /> PHS/EHD. <br /> Protected Schedule <br /> I <br /> Once approval of this workplan has been received, ATC will obtain preapproval of costs from the <br /> State UST Fund. Upon preapproval of costs, ATC will schedule drilling activities. ATC will <br /> notify PHS/EHD at least 48 hours prior to beginning any field activities. The summary report will <br /> be submitted to PHS/EHD approximately four to five weeks after the completion of field <br /> { <br /> activities. <br /> a l <br /> � I <br /> � I <br /> 1 <br /> w:162577VeportslwkpinVaporExts.doc 6 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.