Laserfiche WebLink
ATC S1TE SAFETY PLAN <br /> On-site communications: 0 Radio IM Verbal 0 Hand Signals <br /> 0 Other <br /> Designate hand signals here, <br /> Off-site communications: 0 Radio ® Telephone <br /> 0 Other <br /> The specific signal for an emergency is- Verbally Given <br /> The specific signal for an evacuation is. Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to be-ginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP OCHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> . i e loves coveralls will be placed in a 55-gallon <br /> drum with sod cuttinas <br /> Location of Wash Water, Restroom on-site <br /> Location of Toilet: Restroom on-site <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure- Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste. All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PAGE 11 <br />