My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011266
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
ARCHIVED REPORTS_XR0011266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 12:00:26 PM
Creation date
1/13/2020 10:51:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011266
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc <br /> Quality AsmwancelQuahty Control Plan <br /> Revised 1998 <br /> or frozen chemical ice for delivery to a state certified laboratory Sample identification, storage <br /> and transportation will be conducted as outlined in the previous section <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner described <br /> in the previous section, however, a backhoe will not be utilized If composite samples are <br /> collected, four brass cylinders will be collected for every 50 cubic yards of material to be <br /> sampled unless otherwise specified by the lead regulatory agency The samples will be <br /> composited by the state certified laboratory personnel prior to testing <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with nonphosphate <br /> detergent (Alconox or equivalent), and rinsed twice with tap water, once with acetone, and once with <br /> deionized water this procedure will be carried out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device <br /> Immediately prior to sampling, the depth to water(DTV) in the well will be recorded The thickness <br /> of product on top of the groundwater, if present, will be measured using an interface probe The <br /> procedure for monitoring is presented in Section 9 0 (Groundwater Monitoring Protocol) <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not be <br /> conducted A product sample will be collected for source identification If all free product cannot be <br /> removed, an interval specific sampling device may be utilized to collect a sample from below the zone <br /> of free product Before collecting groundwater samples from each well, the well will be purged until <br /> indicator parameters (temperature, conductivity, and pH) stabilize This will entail the removal of at <br /> least four well casing volumes by banking or pumping The criteria for determining well casing volumes <br />
The URL can be used to link to this page
Your browser does not support the video tag.