My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011267
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
ARCHIVED REPORTS_XR0011267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:58:32 AM
Creation date
1/13/2020 10:52:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011267
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 0 <br /> TH <br /> • ENVIRONMENTAL TECHNOLOGIES CORPORATION <br /> June 6, 1997 <br /> P90865A <br /> Ms Loi-; Shields <br /> Diesel Performance, Inc <br /> 2804 East Fremont Street <br /> Stockton, California 95208-0387 <br /> Subject Addendum to Proposal P90865 for Limited Site Investigation at 2804 East <br /> Fremont Street, Stockton, California <br /> Dear Ms Shields <br /> Per our telephone conversation on June 4, 1997, Smith Technology is pleased to submit this <br /> addendum to our original proposal <br /> Smith Technology is confident that we can assist Diesel Performance, Inc by providing a limited <br /> subsurface investigation utilizing direct push technology (DPT) If DPT does not work due to <br /> subsurface conditions, Diesel Performance, Inc will not be charged for contractor or Smith <br /> . Technology's time on site Smith Technology will then fulfill the scope of work required under <br /> the contract through utilization of hollow stem augering <br /> The cost for the direct push scope of work defined in proposal P90865 using DPT is $3,537 60 <br /> The estimated cost for using hollow stem augering is $4,103 60 The cost associated with hollow <br /> stem augenng is broken down into tasks in the attached bid sheet <br /> If this proposal is acceptable please sign the Professional Services Agreement contained with this <br /> letter A fully executed copy will be returned to you for your records If you have any questions <br /> or require additional information regarding this proposal and cost estimate, please contact us at <br /> (209) 579-2221 <br /> Respectfully Submitted, <br /> Smith Technology Corporation, <br /> J nne Homsey, P E <br /> Registered Engineer No C47410 <br /> Attachments <br /> w\propoW\p90865 A doc 1 <br /> 1260 Graphics Drive Modesto,CA 95351-1502 (209)579-2221 Fax(209)579-2225 <br /> Engineering Consulting Remediation Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.